Summary
Seeking professional final engineering services relating to the path and sidewalk improvements. The phase ii final engineering design will include: a new ten-foot accessible, concrete shared-use path, a new five-foot, accessible, concrete sidewalk, installation of new traffic signal posts, push button accessible pedestrian signals (aps) and pedestrian signal heads at the northern and southern extents, modifications to existing curb ramps and driveway entrances, and installation of new curb ramps, improvements to intersection pavement markings, relocation of existing utilities and signage, restoration and landscape improvements, regrading of existing open channel, installation of new storm sewer and new connections between open and closed drainage systems.