CityNC
Posted
Aug 27, 2026
Sep 24, 2026
Springs Road Sidewalk
The project generally consists of the furnishing of all materials, labor and equipment for the construction of a 1. 133 mi long sidewalk project along both sides of sr 1453 (12th ave ne/springs rd ne) between sr 1401 (16th st ne/sandy ridge rd) and mcdonald parkway ne and all associated work including, but not limited to, grading, drainage, paving, and signals.