Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The work to be done consists of new construction for a common development which will include approximately 5,287 L.F. of curb and gutter section road, associated storm drainage, sewer and water and striping as per the construction documents provided. The work shall be installed as specified herein and all incidental work required for a complete and functional installation. The work includes approx. 6" PVC water main, 6" DIP water main, fire hydrant, rock excavation, 18" 0'-10' HDPE, 30" 0'-10' RCP, 8" PVC gravity sewer, sanitary sewer manhole, service connection, 5' wide concrete sidewalk, signage, 6' chain link fence, 8' double swing gate.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work includes installation of a sanitary sewer pump station; 2,588 LF of 6" PVC force main; 1,170 LF of 4" PVC gravity sanitary sewer service lines; 4,454 LF of 8" PVC gravity sanitary sewer and associated manholes 0.9 miles of urban roadway including grading, drainage base and pavement, concrete sidewalk, fire lane, curb and gutter; 3,024 LF of storm drain pipe of various sizes; 369 LF of 6" PVC watermain; 4,967 LF of 8" PVC water main, including associated gate valve, fittings. See attached file.
Posted Date
Feb 2, 2026
Due Date
Feb 19, 2026
Release: Feb 2, 2026
Close: Feb 19, 2026
Work includes installation of a sanitary sewer pump station; 2,588 LF of 6" PVC force main; 1,170 LF of 4" PVC gravity sanitary sewer service lines; 4,454 LF of 8" PVC gravity sanitary sewer and associated manholes 0.9 miles of urban roadway including grading, drainage base and pavement, concrete sidewalk, fire lane, curb and gutter; 3,024 LF of storm drain pipe of various sizes; 369 LF of 6" PVC watermain; 4,967 LF of 8" PVC water main, including associated gate valve, fittings. See attached file.
AvailableProvide Railroad Crossing Signal Installation.
Posted Date
Jan 27, 2026
Due Date
Feb 24, 2026
Release: Jan 27, 2026
Close: Feb 24, 2026
Provide Railroad Crossing Signal Installation.
AvailableThe City of Granbury, Texas is soliciting competitive sealed proposals to remediate electrical infrastructure at a lake crossing in compliance with Texas HB 4150 (William Thomas Heath Power Line Safety Act). The scope includes reconductoring existing three‑phase lines with 4/0 ACSR, installing a capacitor, and performing NESC Grade B construction. Proposals are due at the City’s Municipal Service Center by February 10, 2026 at 3:00 PM Central; the RFP was released January 12, 2026.
Posted Date
Jan 12, 2026
Due Date
Feb 10, 2026
Release: Jan 12, 2026
Close: Feb 10, 2026
The City of Granbury, Texas is soliciting competitive sealed proposals to remediate electrical infrastructure at a lake crossing in compliance with Texas HB 4150 (William Thomas Heath Power Line Safety Act). The scope includes reconductoring existing three‑phase lines with 4/0 ACSR, installing a capacitor, and performing NESC Grade B construction. Proposals are due at the City’s Municipal Service Center by February 10, 2026 at 3:00 PM Central; the RFP was released January 12, 2026.
Need to develop long-lasting pipelines that engage students at the earliest stages of career planning to educate them about the numerous opportunities that exist in healthcare. This is vitally important in rural areas where the need for workforce is great and we have the opportunity to create pathways for ohio’s students in k-12 education settings to explore rural health careers, initiate learning in high school, continue training close to home (in technical/trade schools, community colleges, or universities with significant rural engagement), and secure careers in health provider settings within the rural communities that are most familiar to them. Our activities in this initiative will place high priority on integrating pipelines, recruitment and retention activities for 5-year work commitments, and upskilling and workforce development in rhtp sites. Projects will be implemented in partnership with academic institutions, other training facilities, and professional and paraprofessional associations
Posted Date
Jan 2, 2026
Due Date
Mar 10, 2026
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Close: Mar 10, 2026
Need to develop long-lasting pipelines that engage students at the earliest stages of career planning to educate them about the numerous opportunities that exist in healthcare. This is vitally important in rural areas where the need for workforce is great and we have the opportunity to create pathways for ohio’s students in k-12 education settings to explore rural health careers, initiate learning in high school, continue training close to home (in technical/trade schools, community colleges, or universities with significant rural engagement), and secure careers in health provider settings within the rural communities that are most familiar to them. Our activities in this initiative will place high priority on integrating pipelines, recruitment and retention activities for 5-year work commitments, and upskilling and workforce development in rhtp sites. Projects will be implemented in partnership with academic institutions, other training facilities, and professional and paraprofessional associations
Available