Summary
Work includes 1,150 CY excavation and embankment; 3,250 CY excavation and export; 1,400 CY unsuitable excavation (contingency item); 12,816 SY aggregate base course (6" thick); 12,816 SY hot mix asphalt (hma) surface course (3" thick); 18,600 sf pavement markings; 12,417 LF # 1-1/c no. 8 awg, 5 kv, l-824c cable; 12,417 LF #6 solid bare copper counterpoise; 500 LF 1w-2" concrete encased electrical conduit in new ac shoulder; 101 ea l-867b base can in shoulder; 60 EA remove and reinstall l-862 elevated runway edge light; 41 EA remove and reinstall l-861t elevated taxiway edge light; 1 LS demolition, temporary electrical, and miscellaneous electrical work. See outside link.