University Of California At Los Angeles
Higher EducationCA
Posted
Oct 23, 2026
Nov 30, 2026
RRUMC 4th Floor Patient Care Reconfiguration (BP 10 - Glass & Glazing) RFP
UCLA Health plans to convert portions of the fourth floor of Ronald Reagan UCLA Medical Center from behavioral-health to medical/surgical spaces, adding inpatient capacity and upgrading affected building systems. Bid Package #10 covers the glass-and-glazing work, and DPR Construction is inviting sealed lump-sum bids from previously prequalified subcontractors. The estimated construction cost is $975,000, and bids are due at 12:00 PM Pacific Time on November 30, 2026.
