Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Construction of approx. 1,520 LF of gravity sanitary sewer, 11 manholes, 13 lateral connections, one duplex sewage pumping station, 404 linear feet of force main, one stream crossing all located within easements obtained by the Owner over private property and Road right-of-way including all required surface restoration and appurtenances.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The project generally includes installation of approx. 11,400 feet of 8” and 16” PVC waterline and 10,300 feet of 12” PVC sanitary sewer along Summit Road and Morse Road in Licking County, Ohio. The project includes waterline and sanitary sewer piping installation via horizontal directional drilling and jack and bore methods.
Posted Date
Jan 2, 2026
Due Date
Feb 5, 2026
Release: Jan 2, 2026
Close: Feb 5, 2026
The project generally includes installation of approx. 11,400 feet of 8” and 16” PVC waterline and 10,300 feet of 12” PVC sanitary sewer along Summit Road and Morse Road in Licking County, Ohio. The project includes waterline and sanitary sewer piping installation via horizontal directional drilling and jack and bore methods.
AvailableInstallation of 1,950 LF of 10" PVC sanitary sewer and 231 LF of 8" PVC sanitary sewer.
Posted Date
Jan 23, 2026
Due Date
Feb 10, 2026
Release: Jan 23, 2026
Close: Feb 10, 2026
Installation of 1,950 LF of 10" PVC sanitary sewer and 231 LF of 8" PVC sanitary sewer.
Availablework includes approx 1,897 LF of gravity sanitary sewer line; 2,072 LF of 2" force main, lift station, and road bores.
Posted Date
Jan 20, 2026
Due Date
Feb 5, 2026
Release: Jan 20, 2026
Close: Feb 5, 2026
work includes approx 1,897 LF of gravity sanitary sewer line; 2,072 LF of 2" force main, lift station, and road bores.
AvailableThe Project consists of the installation of approx. 5,165 LF of 1.5IN, 2IN, 3IN, and 4IN HDPE low-pressure sanitary sewer piping and associated structures; approx. 85 low-pressure sewer laterals; and restoration of areas disturbed by construction.
Posted Date
Dec 19, 2025
Due Date
Feb 3, 2026
Release: Dec 19, 2025
Close: Feb 3, 2026
The Project consists of the installation of approx. 5,165 LF of 1.5IN, 2IN, 3IN, and 4IN HDPE low-pressure sanitary sewer piping and associated structures; approx. 85 low-pressure sewer laterals; and restoration of areas disturbed by construction.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis