Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Contract No. 1 - General Construction: The work shall include providing all labor, materials and equipment, and other means of construction necessary and incidental to the clearing, filling, and grading of the site for future Wellhouse #6 (constructed under separate contract), as shown on the Contract Drawings and Specifications.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Marco Rural Water Company is soliciting bids for Contract 6 at the Brittons Neck Water Treatment Facility to construct a new reverse osmosis system, evaporation pad, finish water tank, and associated appurtenances. Bids are due January 27, 2026 at 2:00 PM local time; bidding documents are available from Hanna Engineering (Issuing Office) and via the project details link on the official posting. The project is funded in whole or in part through the South Carolina Infrastructure Investment Program (SCIIP) but is a construction procurement (contract), not a grant program.
Posted Date
Dec 19, 2025
Due Date
Jan 27, 2026
Release: Dec 19, 2025
Close: Jan 27, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Marco Rural Water Company is soliciting bids for Contract 6 at the Brittons Neck Water Treatment Facility to construct a new reverse osmosis system, evaporation pad, finish water tank, and associated appurtenances. Bids are due January 27, 2026 at 2:00 PM local time; bidding documents are available from Hanna Engineering (Issuing Office) and via the project details link on the official posting. The project is funded in whole or in part through the South Carolina Infrastructure Investment Program (SCIIP) but is a construction procurement (contract), not a grant program.
AvailableThis Request for Proposals (RFP) from New Braunfels Utilities seeks contractors for site improvements at Well 6. The project involves demolition, construction of a CMU building, installation of an emergency generator, and various piping and control systems. It also includes site grading, fencing, and other necessary appurtenances.
Posted Date
Dec 19, 2025
Due Date
Jan 22, 2026
Release: Dec 19, 2025
Close: Jan 22, 2026
This Request for Proposals (RFP) from New Braunfels Utilities seeks contractors for site improvements at Well 6. The project involves demolition, construction of a CMU building, installation of an emergency generator, and various piping and control systems. It also includes site grading, fencing, and other necessary appurtenances.
AvailableConstruction of water well no. 4 including electrical components, well header, yard piping, site improvements, and all related appurtenances.
Posted Date
Dec 17, 2025
Due Date
Jan 22, 2026
Release: Dec 17, 2025
Close: Jan 22, 2026
Construction of water well no. 4 including electrical components, well header, yard piping, site improvements, and all related appurtenances.
AvailableWell #4 and Well #5 Electrical and Water System Improvement project includes various electrical, mechanical, HVAC, SCADA and site improvements to the existing Well #4 and Well #5 stations. Improvements include the following: selective demolition, furnish and install existing motor control centers, appropriate surge protection, step-down transformers, 120/208V panelboards, and install new 100hp variable frequency drives; replace existing interior and exterior lighting; upgrade of existing SCADA panels; furnish and install all necessary piping to connect new pump control valve, painting of all process piping; furnish and install new electrical unit heaters, exhaust fans, and louver actuators; existing driveway replacement for well #5, construction of a permanent foundation for the existing well 5 generator, well #5 generator modification and installation on permanent foundation, perimeter fencing removal and replacement, and new sliding access gates; and replacement of the existing acoustical panel ceilings. The project includes the installation of a new 300hp variable frequency drive and furnish and install motor replacement of the existing Well #2.
Posted Date
Dec 10, 2025
Due Date
Jan 30, 2026
Release: Dec 10, 2025
Close: Jan 30, 2026
Well #4 and Well #5 Electrical and Water System Improvement project includes various electrical, mechanical, HVAC, SCADA and site improvements to the existing Well #4 and Well #5 stations. Improvements include the following: selective demolition, furnish and install existing motor control centers, appropriate surge protection, step-down transformers, 120/208V panelboards, and install new 100hp variable frequency drives; replace existing interior and exterior lighting; upgrade of existing SCADA panels; furnish and install all necessary piping to connect new pump control valve, painting of all process piping; furnish and install new electrical unit heaters, exhaust fans, and louver actuators; existing driveway replacement for well #5, construction of a permanent foundation for the existing well 5 generator, well #5 generator modification and installation on permanent foundation, perimeter fencing removal and replacement, and new sliding access gates; and replacement of the existing acoustical panel ceilings. The project includes the installation of a new 300hp variable frequency drive and furnish and install motor replacement of the existing Well #2.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →