Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Contract No. 1 - General Construction: The work shall include providing all labor, materials and equipment, and other means of construction necessary and incidental to the clearing, filling, and grading of the site for future Wellhouse #6 (constructed under separate contract), as shown on the Contract Drawings and Specifications.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Provide 2022 Water Line Replacement Project Contract No. 1 – Water System Improvements.2022 Water Line Replacement Project Contract No. 1 – Water System Improvements
Posted Date
Dec 8, 2025
Due Date
Jan 6, 2026
Release: Dec 8, 2025
Close: Jan 6, 2026
Provide 2022 Water Line Replacement Project Contract No. 1 – Water System Improvements.2022 Water Line Replacement Project Contract No. 1 – Water System Improvements
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Marco Rural Water Company is soliciting bids for Contract 6 at the Brittons Neck Water Treatment Facility to construct a new reverse osmosis system, evaporation pad, finish water tank, and associated appurtenances. Bids are due January 27, 2026 at 2:00 PM local time; bidding documents are available from Hanna Engineering (Issuing Office) and via the project details link on the official posting. The project is funded in whole or in part through the South Carolina Infrastructure Investment Program (SCIIP) but is a construction procurement (contract), not a grant program.
Posted Date
Dec 19, 2025
Due Date
Jan 27, 2026
Release: Dec 19, 2025
Close: Jan 27, 2026
Marco Rural Water Company is soliciting bids for Contract 6 at the Brittons Neck Water Treatment Facility to construct a new reverse osmosis system, evaporation pad, finish water tank, and associated appurtenances. Bids are due January 27, 2026 at 2:00 PM local time; bidding documents are available from Hanna Engineering (Issuing Office) and via the project details link on the official posting. The project is funded in whole or in part through the South Carolina Infrastructure Investment Program (SCIIP) but is a construction procurement (contract), not a grant program.
AvailableThis Request for Proposals (RFP) from New Braunfels Utilities seeks contractors for site improvements at Well 6. The project involves demolition, construction of a CMU building, installation of an emergency generator, and various piping and control systems. It also includes site grading, fencing, and other necessary appurtenances.
Posted Date
Dec 19, 2025
Due Date
Jan 22, 2026
Release: Dec 19, 2025
Close: Jan 22, 2026
This Request for Proposals (RFP) from New Braunfels Utilities seeks contractors for site improvements at Well 6. The project involves demolition, construction of a CMU building, installation of an emergency generator, and various piping and control systems. It also includes site grading, fencing, and other necessary appurtenances.
AvailableProcurement of materials, equipment, and labor for the construction of a Well House and Treatment system, excluding the Well, Well Pump, and 250,000 Gallon Elevated Storage Tank, for the Phase 5 Water System Improvements.
Posted Date
-
Due Date
Jan 14, 2026
Close: Jan 14, 2026
Procurement of materials, equipment, and labor for the construction of a Well House and Treatment system, excluding the Well, Well Pump, and 250,000 Gallon Elevated Storage Tank, for the Phase 5 Water System Improvements.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →