Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provision of industrial electrician services.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Provide electrician contract services.
Posted Date
Dec 18, 2025
Due Date
Jan 27, 2026
Release: Dec 18, 2025
Close: Jan 27, 2026
Provide electrician contract services.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide electrical/electrician services.
Posted Date
Dec 18, 2025
Due Date
Jan 16, 2026
Release: Dec 18, 2025
Close: Jan 16, 2026
Provide electrical/electrician services.
AvailableProviding electrician services to the city under a multi-year contract. The electrician services shall include "supervising electrician" for the city's electrical master permit, which covers all city facilities, including the wastewater treatment plant, pump stations and water treatment plants. The firm will demonstrate expertise and experience in: General maintenance and repair of existing domestic and commercial wiring; Locating faulty wiring, repairing and troubleshooting electrical systems; Providing and installing conduit, wiring, junction boxes, fixtures and electrical equipment to repair or replace existing installations; Replacement of electrical equipment, conduits and other equipment that is in need of repair. Promptly providing emergency electrical repair services; Electrical work associated with wastewater treatment plants, lift stations, and water treatment plants; quality control and performance monitoring of services provided, specific to municipal electrical systems; Trenching, installation and backfill of underground conduits; Installation of electrical pull boxes and vaults; Installation of Type 3 Meter pedestals and foundations; nstallation and/or repair of transformers, panel boards, lighting controls, motor controls (including variable frequency drives), branch and feeder conductors, circuit breakers, fuses, and fusible disconnects.
Posted Date
Dec 16, 2025
Due Date
Jan 15, 2026
Release: Dec 16, 2025
Close: Jan 15, 2026
Providing electrician services to the city under a multi-year contract. The electrician services shall include "supervising electrician" for the city's electrical master permit, which covers all city facilities, including the wastewater treatment plant, pump stations and water treatment plants. The firm will demonstrate expertise and experience in: General maintenance and repair of existing domestic and commercial wiring; Locating faulty wiring, repairing and troubleshooting electrical systems; Providing and installing conduit, wiring, junction boxes, fixtures and electrical equipment to repair or replace existing installations; Replacement of electrical equipment, conduits and other equipment that is in need of repair. Promptly providing emergency electrical repair services; Electrical work associated with wastewater treatment plants, lift stations, and water treatment plants; quality control and performance monitoring of services provided, specific to municipal electrical systems; Trenching, installation and backfill of underground conduits; Installation of electrical pull boxes and vaults; Installation of Type 3 Meter pedestals and foundations; nstallation and/or repair of transformers, panel boards, lighting controls, motor controls (including variable frequency drives), branch and feeder conductors, circuit breakers, fuses, and fusible disconnects.
AvailableSeeking a qualified engineering firm for the Preliminary Engineering Report (PER), Design, and Construction Services for the Foothills Regional Airport Industrial Sewer Project.
Posted Date
Dec 18, 2025
Due Date
Jan 16, 2026
Release: Dec 18, 2025
Close: Jan 16, 2026
Seeking a qualified engineering firm for the Preliminary Engineering Report (PER), Design, and Construction Services for the Foothills Regional Airport Industrial Sewer Project.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →