Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes removal outdated play structure; removal of outdated wading pool and support building; installation of a new parking lot; installation of a new playground of similar or better play value; installation of a new recirculating and uv filtered splash pad.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Renovations to an existing playspace. e Project will include the renovation of an existing splash pad and playground by late spring 2026.
Posted Date
Dec 24, 2025
Due Date
Jan 31, 2026
Release: Dec 24, 2025
Close: Jan 31, 2026
Renovations to an existing playspace. e Project will include the renovation of an existing splash pad and playground by late spring 2026.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of Galesburg is soliciting sealed proposals for the design and installation of a splash pad at Cooke Park for the Parks and Recreation Department. The project is funded in whole or in part with grant funds from the Illinois Department of Commerce and Economic Opportunity (DCEO) and is subject to prevailing wage and other federal/state requirements. Proposals are due February 4, 2026 at 11:00 a.m. local time; proposal forms and full solicitation documents are available from the City of Galesburg bid page.
Posted Date
Jan 7, 2026
Due Date
Feb 4, 2026
Release: Jan 7, 2026
Close: Feb 4, 2026
The City of Galesburg is soliciting sealed proposals for the design and installation of a splash pad at Cooke Park for the Parks and Recreation Department. The project is funded in whole or in part with grant funds from the Illinois Department of Commerce and Economic Opportunity (DCEO) and is subject to prevailing wage and other federal/state requirements. Proposals are due February 4, 2026 at 11:00 a.m. local time; proposal forms and full solicitation documents are available from the City of Galesburg bid page.
AvailableRequest for Qualifications for a General Contractor to renovate the Pomonok Houses Splash Pad and Playground.
Posted Date
Dec 23, 2025
Due Date
Jan 31, 2026
Release: Dec 23, 2025
Close: Jan 31, 2026
Request for Qualifications for a General Contractor to renovate the Pomonok Houses Splash Pad and Playground.
AvailableWork consists of full removal and replacement of the existing splash pad. This includes demolition and disposal of all existing spray features, piping, valves, controllers, and associated equipment. The new installation shall include a like-for-like splash pad with new concrete slab and non-skid coating, a push button activator, new spray features (similar to the previous water features), trench drainage systems, and all supporting infrastructure. Utility work includes trenching and connection from the main water line to a new above ground valve cabinet to new 2" water lines to the splash pad system, as well as sewer connections for drainage.
Posted Date
Jan 14, 2026
Due Date
Feb 17, 2026
Release: Jan 14, 2026
Close: Feb 17, 2026
Work consists of full removal and replacement of the existing splash pad. This includes demolition and disposal of all existing spray features, piping, valves, controllers, and associated equipment. The new installation shall include a like-for-like splash pad with new concrete slab and non-skid coating, a push button activator, new spray features (similar to the previous water features), trench drainage systems, and all supporting infrastructure. Utility work includes trenching and connection from the main water line to a new above ground valve cabinet to new 2" water lines to the splash pad system, as well as sewer connections for drainage.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →