Retrieving RFP details
Release
Close
Marblehead Public Schools
Contractors for the Roofing & HVAC Equipment Replacement. This project includes recovering the existing membrane or, as an alternate, doing a roof restoration (fluid-applied) over the existing membrane and replacement of all the mechanical equipment on the roof.
Union School District
Removal and Replacement of Rooftop HVAC Equipment At School.
Grossmont Union High School District
HVAC and Roofing.
Lindenwold School District
Partial HVAC system renovation and the subdivision of three classrooms into six smaller classrooms at high school.
Release
Oct 22, 2025
Close
Nov 13, 2025