Summary
Roofing restoration work at roof areas #3 and 4, remove gravel surface, clean and repair all defects in the existing roof system per roofing manufacturers requirements, install cold process, heavy-bodied, rubberized, fiber reinforced, fire-rated restoration treatment. Install new gravel. Install pre-finished aluminum metal wall panel installation work at roof areas #3 and 4 over existing masonry rising wall. Install pre-finished aluminum metal edge and fascia extender; roofing expansion joints, new pipe curb; lead flashing at vent stack(s); area divider(s); pipe / conduit supports on walkway pads and all associated work as indicated on the drawings. Additional low slope alternate bid areas are to be restored in a similar manner as the base bid. Note there is no metal panel installation on the alternate bid low slope roof areas. At alternate bid steep slope metal areas, clean and repair all defects in the existing roof system per roofing manufacturers requirements. Install synthetic liquid rubber membrane per roofing manufacturers requirements.