Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Complete roof replacement on middle school. The intent of this specification is to provide a means to complete roof replacement over All shingled roofs consisting of Areas N, O, P1, Q, V, W, X, Y, Z, AA, BB, CC, DD, EE , FF, GG & HH. Roof replacement to consist of complete removal of ALL existing roof systems, including underlayment, drip edge, loose ice and water shield, any low sloped roofing and sheet metal flashings such as drip edge / fascia, counter and step flashings. Replacement will be completed with new asphalt-based dimensional shingles and all associated sheet metal flashings. Shingle Areas - N, O, P1, Q, V, W, X, Y, Z, AA, BB, CC, DD, EE, FF, GG & HH.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Grosse Ile Township Schools is soliciting bids for shingle roof replacement services as part of its 2022 Bond Program, with a project duration of 90 days. Bidding documents are available through the eBuilder site and bidders must submit proposals by hand or mail; submissions are due by 11:00 a.m. local time on January 22, 2026. The Board of Education reserves the right to accept or reject any or all bids.
Posted Date
-
Due Date
Jan 22, 2026
Release: -
Close: Jan 22, 2026
Grosse Ile Township Schools is soliciting bids for shingle roof replacement services as part of its 2022 Bond Program, with a project duration of 90 days. Bidding documents are available through the eBuilder site and bidders must submit proposals by hand or mail; submissions are due by 11:00 a.m. local time on January 22, 2026. The Board of Education reserves the right to accept or reject any or all bids.
AvailableComplete replacement of asphalt shingles on the elementary school. The estimated roof area to be replaced is approximately 228,000 SF. This project aims to ensure the long-term structural integrity and weatherproofing of the school building.
Posted Date
-
Due Date
Jan 19, 2026
Close: Jan 19, 2026
Complete replacement of asphalt shingles on the elementary school. The estimated roof area to be replaced is approximately 228,000 SF. This project aims to ensure the long-term structural integrity and weatherproofing of the school building.
AvailableReplacement of existing concrete roof, installation of a bypass line, and replacement of the MCC panel at the Pump Station; Modifications to the existing roof including: demolition and complete replacement of existing concrete roof with either Aluminum geodesic dome roof or sloped Concrete roof; Replacement of main pump station bypass & intake valve(s); Electrical modifications to the existing pump station include replacement of the existing MCC; Modifications of the existing site also include replacement and relocation of security fence and chlorination building repairs.
Posted Date
Dec 6, 2025
Due Date
Jan 7, 2026
Release: Dec 6, 2025
Close: Jan 7, 2026
Replacement of existing concrete roof, installation of a bypass line, and replacement of the MCC panel at the Pump Station; Modifications to the existing roof including: demolition and complete replacement of existing concrete roof with either Aluminum geodesic dome roof or sloped Concrete roof; Replacement of main pump station bypass & intake valve(s); Electrical modifications to the existing pump station include replacement of the existing MCC; Modifications of the existing site also include replacement and relocation of security fence and chlorination building repairs.
Roof Replacement at High School.
Posted Date
Dec 14, 2025
Due Date
Jan 21, 2026
Release: Dec 14, 2025
Close: Jan 21, 2026
Roof Replacement at High School.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis