Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Requirement is for roof fall protection services to include inspection, repairs, and certification for the various pentagon fall protection systems.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Project consists of the procurement and installation of fall protection roof edge rail systems, roof hatch rail systems and ladder access safety systems.
Posted Date
Dec 16, 2025
Due Date
Jan 21, 2026
Release: Dec 16, 2025
Close: Jan 21, 2026
Project consists of the procurement and installation of fall protection roof edge rail systems, roof hatch rail systems and ladder access safety systems.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Skanska USA Civil is soliciting bids for the 'BRT Stations Fall Protection' package as part of WSDOT’s I-405/Brickyard to SR 527 Improvement Project, which delivers Stride bus rapid transit stations and related facilities. The scope covers provision and integration of fall protection systems at BRT station facilities, to be delivered under Skanska’s design-build prime contract for WSDOT. Bids are due via BuildingConnected on January 12, 2026, and participation by certified SBE, VOB, MBE, and WBE firms is encouraged.
Posted Date
-
Due Date
Jan 12, 2026
Release: -
Close: Jan 12, 2026
Skanska USA Civil is soliciting bids for the 'BRT Stations Fall Protection' package as part of WSDOT’s I-405/Brickyard to SR 527 Improvement Project, which delivers Stride bus rapid transit stations and related facilities. The scope covers provision and integration of fall protection systems at BRT station facilities, to be delivered under Skanska’s design-build prime contract for WSDOT. Bids are due via BuildingConnected on January 12, 2026, and participation by certified SBE, VOB, MBE, and WBE firms is encouraged.
AvailableThe City of Miramar issued a Request for Quotation (RFQu-26-PW009-0-2026/DMK) for maintenance, repair, and inspection services of fire protection systems (hydrants, sprinklers, smoke detectors, fire barriers) on an as-needed basis. The solicitation was posted 2025-12-16 and closes 2026-01-21, with bid documents distributed through DemandStar. This is a services procurement (not a grant) for routine inspection, maintenance and repair across city properties.
Posted Date
Dec 16, 2025
Due Date
Jan 21, 2026
Release: Dec 16, 2025
Close: Jan 21, 2026
The City of Miramar issued a Request for Quotation (RFQu-26-PW009-0-2026/DMK) for maintenance, repair, and inspection services of fire protection systems (hydrants, sprinklers, smoke detectors, fire barriers) on an as-needed basis. The solicitation was posted 2025-12-16 and closes 2026-01-21, with bid documents distributed through DemandStar. This is a services procurement (not a grant) for routine inspection, maintenance and repair across city properties.
AvailableRoof replacement. Supply and install TPO roof on approx 65,000 square feet roof. Remove and replace roof system or overlay with new TPO roof system as indicated. Project includes fall protection, lighting protection and roof drain piping.
Posted Date
Dec 18, 2025
Due Date
Jan 15, 2026
Release: Dec 18, 2025
Close: Jan 15, 2026
Roof replacement. Supply and install TPO roof on approx 65,000 square feet roof. Remove and replace roof system or overlay with new TPO roof system as indicated. Project includes fall protection, lighting protection and roof drain piping.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →