Rogers Avenue Water Storage Tank Bypass Provisions RFP
Work includes water distribution system improvements, drainage installation, and associated site restoration at the Rogers Ave water storage tank.
Description: The Town of West Springfield, through its Department of Public Works, is seeking sealed bids from qualified contractors for water distribution system improvements, drainage installation, and associated site restoration at the Rogers Ave water storage tank. Specifications may be obtained from: https://www.townofwestspringfield.org/government/departments/finance/procurement-bids Water Storage Tank Bypass Provisions
City · MA, US
Adjacent opportunities open for bidding right now.
Posted
Nov 5, 2026
Dec 10, 2026
Work includes water distribution system improvements, drainage installation, and associated site restoration at the Rogers Ave water storage tank.
CityMA
Posted
Nov 5, 2026
Dec 10, 2026
The project addresses the isolation and draining of the Rogers Avenue Water Storage Tank. Existing isolation valves leak, make it difficult to keep the tank empty, cause pressure fluctuations in the surrounding water service area, and do not allow the tank water to be discreetly disposed of during maintenance or inspections. The work also incorporates provisions for the 24-inch transmission main so local distribution piping can be supplied more efficiently during tank isolation.
CityMA
Posted
Nov 5, 2026
Dec 10, 2026
The Town of West Springfield is procuring improvements to address isolation and drainage problems at the Rogers Avenue Water Storage Tank. Anticipated work includes bypass piping and valves between the 12-inch and 24-inch mains, connections between dead-end water mains, and relocation or replacement of valves. The project also includes provisions for draining tank water into a storm drain or sanitary sewer and relocating or installing a fire hydrant on Toccoa.
Hingham Municipal Lighting Plant
Special DistrictMA
Posted
Nov 11, 2026
Dec 10, 2026
The work includes the installation of a 1 million GAL composite style, elevated, glass-fused-to-steel, water storage tank with a 52-foot tall cast-in-place, concrete pedestal; tank mixing system; demolition/removal of the existing storage shed and tank footing; site work; utilities; fencing; earthwork; associated equipment and controls; mechanical and electrical equipment; instrumentation and SCADA integration, and all necessary and incidental appurtenances to complete the installation.
Solicitation files and supporting documents for this bid.
Decision makers connected to this RFP from City of West Springfield.