Open RFP

Rock Falls – Water Treatment Plant MCC Replacement and Detention Tank Rehabilitation RFP

Description: Replace and relocate the motor control center for the high service pumps at the water treatment plant. Replace and relocate the main distribution panel at the water treatment plant. water treatment plant pre-filter detention tank rehabilitation install temporary detention tank(s) with high service pumps, piping, and pre-chlorination system for bypassing the detention tank during rehabilitation. Pressure wash and clean the inside of the tank, repair the cracks in the concrete walls and floor, apply an nsf approved waterproof coating on the concrete walls, floor, and ceiling on the inside of the tank, and paint all piping/fittings in the tank. Paint all walls, floor, ceiling, piping/valves/fittings in the high service pump valve vault that is connected to the detention tank.

Buyer
City of Rock Falls

City · IL, US

Released
Oct 8, 2026
Closes
Nov 19, 2026(36 days left)

RFP documents

Solicitation files and supporting documents for this bid.

RFP documents aren’t available here yet.

Our team can help you find the original solicitation documents.

Request File Retrieval
See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts