Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Construction of the concrete work for the roundabout at the intersection of road.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work to consist of non-capital concrete construction, renovation, and repair; to include concrete stairs, curbing, sidewalks, walkways, ramps, and other miscellaneous concrete structures.
Posted Date
Nov 18, 2025
Due Date
Dec 16, 2025
Release: Nov 18, 2025
Close: Dec 16, 2025
Work to consist of non-capital concrete construction, renovation, and repair; to include concrete stairs, curbing, sidewalks, walkways, ramps, and other miscellaneous concrete structures.
AvailablePremium
Access the largest public sector contact database
Work consists of converting existing two-way stop-controlled intersections to a single lane roundabout, milling and resurfacing, concrete curb, lane-splitters and center island, extending existing sidewalk on the west side of avenue south through the south and west leg of the roundabout and relocating the existing water main and force main to accommodate the roadway improvement.
Posted Date
Nov 16, 2025
Due Date
Dec 18, 2025
Release: Nov 16, 2025
Close: Dec 18, 2025
Work consists of converting existing two-way stop-controlled intersections to a single lane roundabout, milling and resurfacing, concrete curb, lane-splitters and center island, extending existing sidewalk on the west side of avenue south through the south and west leg of the roundabout and relocating the existing water main and force main to accommodate the roadway improvement.
AvailableThe Virginia Department of Transportation (VDOT) is soliciting bids for construction of a roundabout under the Smart Scale program on Route 40 in Nottoway County to improve traffic flow and safety. Work includes clearing, drainage installation (concrete pipes and drop inlets), excavation, erosion control, asphalt paving, and traffic control devices, with environmental protection measures for contaminated groundwater/soil. Bidders must be prequalified with VDOT and submit electronic bids (Bid Express); questions are to be submitted through VDOT systems (CABB).
Posted Date
Dec 9, 2025
Due Date
Jan 28, 2026
Release: Dec 9, 2025
Close: Jan 28, 2026
The Virginia Department of Transportation (VDOT) is soliciting bids for construction of a roundabout under the Smart Scale program on Route 40 in Nottoway County to improve traffic flow and safety. Work includes clearing, drainage installation (concrete pipes and drop inlets), excavation, erosion control, asphalt paving, and traffic control devices, with environmental protection measures for contaminated groundwater/soil. Bidders must be prequalified with VDOT and submit electronic bids (Bid Express); questions are to be submitted through VDOT systems (CABB).
AvailableConstruction of the central parking lot & roundabout.
Posted Date
Dec 9, 2025
Due Date
Feb 17, 2026
Release: Dec 9, 2025
Close: Feb 17, 2026
Construction of the central parking lot & roundabout.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis