Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Grants
Installation of two new lift station structure, force main and service line. The installation of both new lift stations also includes new duplex pump with new controls, piping, and check valves. Installation of a new 2", 4", and 8" force main and 4" service line via open trench. The 2" force main installation includes the connection to an existing force main within existing collection system. Service line installation includes the connection to the existing cleanout found on the west side of the building. The 8" force main installation includes the connection to an existing force main connecting into Manhole #6001 West of Lift Station 2. The 4" force main installation includes the connection to an existing force main connecting into Manhole #6001 West of Lift Station 2.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
City of Titusville
Work includes installation of a new lift station and demolition/abandonment of the existing lift station. Maintaining operations of all systems during construction. Installation of new gravity system and other work.
Posted Date
Nov 7, 2025
Due Date
Dec 9, 2025
Release: Nov 7, 2025
City of Titusville
Close: Dec 9, 2025
Work includes installation of a new lift station and demolition/abandonment of the existing lift station. Maintaining operations of all systems during construction. Installation of new gravity system and other work.
AvailableCity of Long Beach
Work consists of 1 LS Mobilization and Demobilization; 1 LS Lift Station 2 Improvements; 1 LS Lift Station 5 Improvements; 1 LS Breakers Lift Station Improvements; 10 CY Unsuitable Excavation; 1 LS Lift Station 2 Bypass Pumping; 1 LS Lift Station 5 Bypass Pumping; 1 LS Breakers Lift Station Bypass Pumping; 1 LS Lift Station 2 Electrical; 1 LS Lift Station 5 Electrical; 1 LS Breakers Lift Station Electrical.
Posted Date
Oct 22, 2025
Due Date
Nov 25, 2025
Release: Oct 22, 2025
City of Long Beach
Close: Nov 25, 2025
Work consists of 1 LS Mobilization and Demobilization; 1 LS Lift Station 2 Improvements; 1 LS Lift Station 5 Improvements; 1 LS Breakers Lift Station Improvements; 10 CY Unsuitable Excavation; 1 LS Lift Station 2 Bypass Pumping; 1 LS Lift Station 5 Bypass Pumping; 1 LS Breakers Lift Station Bypass Pumping; 1 LS Lift Station 2 Electrical; 1 LS Lift Station 5 Electrical; 1 LS Breakers Lift Station Electrical.
AvailableCity of Bismarck
The project primarily consists of installing a UV treatment system to the existing wastewater treatment plant, construction of a new lift station facility and equipment replacement in an existing lift station.
Posted Date
Sep 29, 2025
Due Date
Nov 19, 2025
Release: Sep 29, 2025
City of Bismarck
Close: Nov 19, 2025
The project primarily consists of installing a UV treatment system to the existing wastewater treatment plant, construction of a new lift station facility and equipment replacement in an existing lift station.
AvailableCity of Huntington Beach
Work consists of replacement and modernization of the McFadden Sewer Lift Station (Station No. 21). The Work includes construction of a new 120 gpm submersible sewer lift station, wet well and valve vault, installation of new gravity sewer and force main, demolition and abandonment of existing facilities, installation of a backup power generator and enclosure, and site restoration. The project includes construction of curb, gutter, sidewalk, AC paving, and other appurtenant work.
Posted Date
Oct 15, 2025
Due Date
Nov 20, 2025
Release: Oct 15, 2025
City of Huntington Beach
Close: Nov 20, 2025
Work consists of replacement and modernization of the McFadden Sewer Lift Station (Station No. 21). The Work includes construction of a new 120 gpm submersible sewer lift station, wet well and valve vault, installation of new gravity sewer and force main, demolition and abandonment of existing facilities, installation of a backup power generator and enclosure, and site restoration. The project includes construction of curb, gutter, sidewalk, AC paving, and other appurtenant work.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis