Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The work to be completed consists of furnishing all materials, equipment, and labor necessary for the complete removal and reconstruction of Bishops Gate, and full depth pavement patching and surface milling and overlay improvements.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Release: Dec 11, 2025
Close: Feb 11, 2026
Work includes roadway improvements.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Requests proposals from qualified professional engineering consultants for the purpose of Construction Engineering Services (“Services”) for the Village’s 2026 Utility and Roadway Improvements Project. Work consists of onsists of roadway reconstruction, milling and resurfacing, various removals; storm sewer and drainage structures; water distribution system improvements; sanitary sewer collection and conveyance system repairs; hot mix asphalt and concrete driveways; hot mix asphalt pavement; sodding; and all incidental and collateral work necessary to complete the improvements.
Posted Date
Jan 12, 2026
Due Date
Jan 30, 2026
Release: Jan 12, 2026
Close: Jan 30, 2026
Requests proposals from qualified professional engineering consultants for the purpose of Construction Engineering Services (“Services”) for the Village’s 2026 Utility and Roadway Improvements Project. Work consists of onsists of roadway reconstruction, milling and resurfacing, various removals; storm sewer and drainage structures; water distribution system improvements; sanitary sewer collection and conveyance system repairs; hot mix asphalt and concrete driveways; hot mix asphalt pavement; sodding; and all incidental and collateral work necessary to complete the improvements.
AvailableRoadway improvements.
Posted Date
-
Due Date
Jan 29, 2026
Release: -
Close: Jan 29, 2026
Roadway improvements.
AvailableConstructing the roadway improvements/additional lanes (grading, drainage, pavement, traffic signs, and traffic stripe.
Posted Date
Jan 14, 2026
Due Date
Jan 30, 2026
Release: Jan 14, 2026
Close: Jan 30, 2026
Constructing the roadway improvements/additional lanes (grading, drainage, pavement, traffic signs, and traffic stripe.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →