Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Florida Fish and Wildlife Conservation Commission (FWC) seeks competitive pricing for road capping services on Banana Grove Road and an adjoining parking loop at Fisheating Creek Wildlife Management Area in Glades County, Florida. The scope includes supplying DOT-certified shell rock or lime rock, spreading and compacting a minimum of 4 inches of fill, debris removal, and ensuring a smooth surface suitable for two-wheel drive vehicles; work must be completed by May 30, 2026. Bidders must be registered in the MyFloridaMarketPlace (MFMP) system and with SunBiz, provide references, and the solicitation is listed as ITB-14751 with response dates Jan 8, 2026 (start) through Jan 29, 2026 (deadline).
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Hackberry Flat Wma Water Control Structures.
Posted Date
Dec 16, 2025
Due Date
Jan 13, 2026
Release: Dec 16, 2025
Close: Jan 13, 2026
Hackberry Flat Wma Water Control Structures.
AvailableGreat River Greening seeks proposals and quotes from qualified and experienced firms to perform the selective habitat enhancement activities across up to 396 acres area at the Lamberton WMA, Lamberton MN, Redwood County.
Posted Date
Jan 6, 2026
Due Date
Jan 23, 2026
Release: Jan 6, 2026
Close: Jan 23, 2026
Great River Greening seeks proposals and quotes from qualified and experienced firms to perform the selective habitat enhancement activities across up to 396 acres area at the Lamberton WMA, Lamberton MN, Redwood County.
AvailableSale of approx. 3,718 AC of grazing lease.
Posted Date
-
Due Date
Feb 5, 2026
Release: -
Close: Feb 5, 2026
Sale of approx. 3,718 AC of grazing lease.
AvailableWork includes improvement of. 9 miles of existing WMA roadway; this project will entail utilizing material adjacent to the current roadbed to a maximum distance of 10' on either or both sides of the existing road as needed, to build the existing road bed up to a sufficient height to improve water control. This will be done by creating a ditch on the uphill side of the road in its entirety and on the downhill side of the road anywhere that the water cant immediately leave the roadside, building the roadbed up to a minimum amount (to be determined at pre-bid meeting), pack the material via rolling, and blade a crown into the road, facilitating water removal from the road. Minimum road width of 12'. See attached file.
Posted Date
Dec 10, 2025
Due Date
Jan 22, 2026
Release: Dec 10, 2025
Close: Jan 22, 2026
Work includes improvement of. 9 miles of existing WMA roadway; this project will entail utilizing material adjacent to the current roadbed to a maximum distance of 10' on either or both sides of the existing road as needed, to build the existing road bed up to a sufficient height to improve water control. This will be done by creating a ditch on the uphill side of the road in its entirety and on the downhill side of the road anywhere that the water cant immediately leave the roadside, building the roadbed up to a minimum amount (to be determined at pre-bid meeting), pack the material via rolling, and blade a crown into the road, facilitating water removal from the road. Minimum road width of 12'. See attached file.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis