Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Hackberry Flat Wma Water Control Structures.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work includes improvement of. 9 miles of existing WMA roadway; this project will entail utilizing material adjacent to the current roadbed to a maximum distance of 10' on either or both sides of the existing road as needed, to build the existing road bed up to a sufficient height to improve water control. This will be done by creating a ditch on the uphill side of the road in its entirety and on the downhill side of the road anywhere that the water cant immediately leave the roadside, building the roadbed up to a minimum amount (to be determined at pre-bid meeting), pack the material via rolling, and blade a crown into the road, facilitating water removal from the road. Minimum road width of 12'. See attached file.
Posted Date
Dec 10, 2025
Due Date
Jan 22, 2026
Release: Dec 10, 2025
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Close: Jan 22, 2026
Work includes improvement of. 9 miles of existing WMA roadway; this project will entail utilizing material adjacent to the current roadbed to a maximum distance of 10' on either or both sides of the existing road as needed, to build the existing road bed up to a sufficient height to improve water control. This will be done by creating a ditch on the uphill side of the road in its entirety and on the downhill side of the road anywhere that the water cant immediately leave the roadside, building the roadbed up to a minimum amount (to be determined at pre-bid meeting), pack the material via rolling, and blade a crown into the road, facilitating water removal from the road. Minimum road width of 12'. See attached file.
AvailableGreat River Greening seeks proposals and quotes from qualified and experienced firms to perform the selective habitat enhancement activities across up to 396 acres area at the Lamberton WMA, Lamberton MN, Redwood County.
Posted Date
Jan 6, 2026
Due Date
Jan 23, 2026
Release: Jan 6, 2026
Close: Jan 23, 2026
Great River Greening seeks proposals and quotes from qualified and experienced firms to perform the selective habitat enhancement activities across up to 396 acres area at the Lamberton WMA, Lamberton MN, Redwood County.
AvailableSeeking qualified vendors to be retained on an as-needed basis to furnish, deliver, install, service, and maintain outdoor playgrounds, fitness equipment, water play equipment, and shade structures.
Posted Date
Dec 18, 2025
Due Date
Feb 3, 2026
Release: Dec 18, 2025
Close: Feb 3, 2026
Seeking qualified vendors to be retained on an as-needed basis to furnish, deliver, install, service, and maintain outdoor playgrounds, fitness equipment, water play equipment, and shade structures.
AvailableThe St. Johns River Water Management District is soliciting quotes for pressure cleaning and wood sealing of recreational structures, facilities, and associated infrastructure across multiple recreation areas in the District’s South Region. The District intends to award a contract to one qualified contractor to provide equipment, personnel, and services to perform the work; the estimated project budget is approximately $35,000. The solicitation includes a non-mandatory pre-bid conference and requires submission of a detailed quote by the stated due date.
Posted Date
Dec 30, 2025
Due Date
Jan 21, 2026
Release: Dec 30, 2025
Close: Jan 21, 2026
The St. Johns River Water Management District is soliciting quotes for pressure cleaning and wood sealing of recreational structures, facilities, and associated infrastructure across multiple recreation areas in the District’s South Region. The District intends to award a contract to one qualified contractor to provide equipment, personnel, and services to perform the work; the estimated project budget is approximately $35,000. The solicitation includes a non-mandatory pre-bid conference and requires submission of a detailed quote by the stated due date.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →