CityMI
-
Closes
Aug 5, 2026
Miller Road Project RFP
The project includes 8 culvert replacements, 29 stations of ditch cleanout, aggregate base, aggregate surface course, 345 tons of HMA surfacing, and traffic control.
Description: Road work.
City · WI, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalThese related opportunities are still open for bidding.
CityMI
-
Closes
Aug 5, 2026
The project includes 8 culvert replacements, 29 stations of ditch cleanout, aggregate base, aggregate surface course, 345 tons of HMA surfacing, and traffic control.
Jul 24, 2026
Closes
Aug 24, 2026
Work inlcudes road resurfacing.
CityPA
Jul 15, 2026
Closes
Aug 3, 2026
Work includes milling approx. 1,450 SY of roadway installing approximately 100 tons of level course 130 ton of 1-1/2" wearing course (9.5 mm pg 64-22 0.0 to 0.3 million esal's srl-m). Road widening will include approximately 90 SY of full depth repair. Project will include base soft spot repair associated line painting and other appurtenances.
CityPA
Jul 22, 2026
Closes
Aug 3, 2026
Paving Project includes the milling, overlay, and widening of Georgetown Road. The project includes installation of asphalt base, binder and wearing courses, new roadway construction along each shoulder, signage, soft spot repair and other work.
Procurement and program contacts connected to Town of Lac du Flambeau.