Ohio Turnpike And Infrastructure Commission
Work consists of the demolition of the existing five-span steel beam bridge, including substructure, and replacement with a two-span steel beam structure on semi-integral abutments and a single center pier support on drilled shafts.
ntb-project-no-43-24-10-rebid
Release
Dec 19, 2024
Close
Jan 24, 2025