Re-lining an existing storm pipe within the Woodland Plaza Apartments' parking lot.
Description: Installation of cured in place pipe (CIPP) lining of approx., 172 LF of 15" diameter and 138 LF of 24" diameter storm pipe within ridge high football field, along with the protection of the surrounding running track during construction.
SchoolDistrict · NJ, US
From the first pre-RFP signals to the published RFP and its files.
Board meeting
703 days before RFP
The board discussed including a Ridge varsity-field turf and drainage project in the proposed 2025-26 budget.
fund and number nine was the recap of uh four capital projects for inclusion in the 2526 budget The Varsity Field Turf and drainage project which is pending uh the D Loi um receipt for that project
Board of Education of Bernards Township Regular Meeting
Board meeting · Nov 18, 2024
Board meeting
577 days before RFP
The March 24, 2025 agenda proposes that the Board authorize Boswell Engineering to perform soil borings, a geotechnical report, and design specifications for Ridge High School Varsity Field drainage and field improvements, with a proposed withdrawal from capital reserve.
10) **WHEREAS**, the Board of Education of Bernards Township (the "Board") has previously entered into an agreement with Boswell Engineering, Inc. for professional services related to the drainage and field improvements at the Ridge High School Varsity Field Complex, dated March 1, 2023; and **WHEREAS**, Boswell Engineering has provided the necessary…
Board meeting
499 days before RFP
The Facilities and Operations Committee recorded review of Ridge varsity field drainage plans, water-retention basin location, and bid options, with further town discussions planned before a decision.
4. Varsity Field Project - Jeff Morris, Boswell Engineering https://drive.google.com/file/d/1_MIQGXYqjb_l80om0Ym7FPS066-RPSJu/view https://drive.google.com/file/d/1AdXtFMHk5DaaehrL_v7pYBpfwECEfmyq/view?usp=drive_link Team did an extensive review of Varsity field next steps and possible options, including the following: field options, turf options,…
Bernards Township Public Schools Meeting
Board meeting · Jun 10, 2025
RFP published
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalProposals due (12 days left)
Bernards Township Board of Education Meeting Minutes
Board meeting · Mar 24, 2025
Adjacent opportunities open for bidding right now.
CityPA
Posted
Oct 9, 2026
Nov 12, 2026
Re-lining an existing storm pipe within the Woodland Plaza Apartments' parking lot.
PennDOT Lebanon County Maintenance Office
State AgencyPA
Posted
Oct 15, 2026
Nov 3, 2026
Furnish and install thermoform PVC pipe liner.
Indiana Department of Transportation
State AgencyIN
Posted
Oct 7, 2026
Nov 5, 2026
Work includes 75 LF of guardrail, reset; 190 LF of fence, farm field, 47 in. ; 4,775 SY of mulched seeding, type r; 355 LF of liner pipe, thermoplastic, circular, 37. 7-38. 5 SF; 4,894 LF of temporary pavement marking, removable, 4 in. ; 550 LF of temporary traffic barrier, type 2; 340 LF of line, thermoplastic, broken, white, 6 in.
Indiana Department of Transportation
State AgencyIN
Posted
Oct 7, 2026
Nov 5, 2026
Work includes approx 307 CY of excavation, common; 240 CY of structure backfill, type 2; 374 SY of milling, asphalt, 1 1/2". ; 160 LF of adhesive; 140 LF of milled hma corrugations, sinusoidal;734 SY of erosion control blanket; 5,795 SY of mulched seeding, type r; 280 LF of line, thermoplastic, solid, white, 4". ; 455 LF of grooving for pavement markings; 140 LF of line, thermoplastic, solid, yellow, 4 in. And associated works; 72 LF 60" trenchless pipe installation; 180 LF 60" CIPP.