Closing soon

Rickenbacker Bldg. 2000 Hvac Replacement (Request for Quote)

Description: Work include replacement of the existing chiller unit (acu-1), existing trane condenser unit (acu-2), and three (3) related air handler units (ahu-1-3) at building 2000, including the ahu variable frequency drive (vfd) (both return and supply), related equipment safety power supply switch/components, chilled water supply and line sets, and all or any other related or required components to make the units whole and operational. In addition, the contractor will assess the existing variable air volume (vav) system in the building and replace vav boxes as required.

Buyer
Released
Aug 12, 2026
Closes
Aug 31, 2026(8 days left)

Files

Original attachments and procurement documents tied to this bid.

See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts