Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work shall include the installation of approx 1,836 LF of 4" forcemain directionally bored under the lake bed, 174 LF of 4" forcemain direct bury, air release manhole, connection to the existing forcemain piping, and other required appurtenances to complete the work.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Construction services for the relocation of sanitary sewer forcemain piping, including installation of 1,836 linear feet of 4" forcemain directionally bored under a lake bed and 174 linear feet of 4" direct bury forcemain, with associated appurtenances.
Posted Date
Jan 8, 2026
Due Date
Jan 21, 2026
Release: Jan 8, 2026
Close: Jan 21, 2026
Construction services for the relocation of sanitary sewer forcemain piping, including installation of 1,836 linear feet of 4" forcemain directionally bored under a lake bed and 174 linear feet of 4" direct bury forcemain, with associated appurtenances.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work consists of the flushing and televising of approx. 94,430 LF of 8"to 15" sanitary gravity sewer. Alternate bid #1 consists of the forcemain cleaning of approx. 3,530 LF of 4" to 8" sanitary forcemains. Alternate bid #2 consists of the forcemain cleaning of approx. 4,505 LF of 4" to 10" sanitary forcemains. Alternate bid #3 consists of the visual inspection of sanitary sewer manholes within the northwest and southeast scope areas.
Posted Date
Dec 24, 2025
Due Date
Jan 28, 2026
Release: Dec 24, 2025
Close: Jan 28, 2026
Work consists of the flushing and televising of approx. 94,430 LF of 8"to 15" sanitary gravity sewer. Alternate bid #1 consists of the forcemain cleaning of approx. 3,530 LF of 4" to 8" sanitary forcemains. Alternate bid #2 consists of the forcemain cleaning of approx. 4,505 LF of 4" to 10" sanitary forcemains. Alternate bid #3 consists of the visual inspection of sanitary sewer manholes within the northwest and southeast scope areas.
AvailableApprox 1200 LF 8" Force main, HDD; 1300 LF 6" Force main, HDD; 300 SY Bituminous Patching; 300 SF Concrete Paving; etc
Posted Date
Jan 8, 2026
Due Date
Feb 5, 2026
Release: Jan 8, 2026
Close: Feb 5, 2026
Approx 1200 LF 8" Force main, HDD; 1300 LF 6" Force main, HDD; 300 SY Bituminous Patching; 300 SF Concrete Paving; etc
AvailableWork includes 1 LS color audio/video recording pre and post construction (dvd); 2,100 LF cctv inspection (pre construction); 2,772 lf cctv inspection (post construction); 1 LS bypass pumping; 1 ls dewatering; 1 ls deflection test (<24"); 10 EA cipp patch/point repair (8" diameter sewer); 1 EA cipp patch/point repair (12" diameter sewer); 939 LF trench excavation and backfill 0-10'; 1,557 lf trench excavation and backfill 0-15'; 152 LF trench excavation and backfill 0-20'; 91 LF 8" sewer pipe (pvc - sdr-35); 1,262 LF 8" sewer pipe (pvc - sdr-26); 843 LF 12" sewer pipe (pvc - sdr-35); 452 LF 12" sewer pipe (pvc - sdr-26). See attached file.
Posted Date
Dec 20, 2025
Due Date
Jan 20, 2026
Release: Dec 20, 2025
Close: Jan 20, 2026
Work includes 1 LS color audio/video recording pre and post construction (dvd); 2,100 LF cctv inspection (pre construction); 2,772 lf cctv inspection (post construction); 1 LS bypass pumping; 1 ls dewatering; 1 ls deflection test (<24"); 10 EA cipp patch/point repair (8" diameter sewer); 1 EA cipp patch/point repair (12" diameter sewer); 939 LF trench excavation and backfill 0-10'; 1,557 lf trench excavation and backfill 0-15'; 152 LF trench excavation and backfill 0-20'; 91 LF 8" sewer pipe (pvc - sdr-35); 1,262 LF 8" sewer pipe (pvc - sdr-26); 843 LF 12" sewer pipe (pvc - sdr-35); 452 LF 12" sewer pipe (pvc - sdr-26). See attached file.