CityMI
Aug 18, 2026
Closes
Sep 1, 2026
As Needed Storm Drain and Sanitary Sewer Repairs
Work includes storm drain / sewer main repair; 6" edge drain; remove and replace 7" concrete pavement; remove and replace 6" concrete drive approach; remove and replace 6" sidewalk ramp; detectable warning surface; remove and replace 4" sidewalk; remove and replace asphalt; mdot 21aa crushed concrete - cip; sand backfill; restoration-topsoil & seed; repair 6" sanitary sewer lead in row with 10' dob; sewer lead repair (6"- 21" diameter, 10' - 12' deep). See outside link.