CountyCA
Jul 22, 2026
Closes
Aug 19, 2026
Third Street Grade Separation RFP
Third street grade separation.
Description: The City of Vaughan is seeking proposals from qualified consulting firms to undertake the Weston 7 Active Transportation Grade Separation Study, identified as RFP26-155. This study supports the Weston 7 Transportation Master Plan by examining grade-separated crossing options and active transportation infrastructure in the Highway 7 / Weston Road / Highway 400 area. The selected consultant will deliver engineering planning and feasibility analyses to inform future infrastructure decisions in the Weston 7 Secondary Plan area in Ontario, Canada.
City · ON, CA
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalProcurement and program contacts connected to Vaughan.
Adjacent opportunities open for bidding right now.
CountyCA
Jul 22, 2026
Closes
Aug 19, 2026
Third street grade separation.
CityCA
Jul 16, 2026
Closes
Aug 19, 2026
The City of Riverside is soliciting electronic bids for construction of the Third Street underpass at the BNSF railroad tracks, including excavation, grading, roadway work, retaining walls, utility relocations, and related improvements. The solicitation is a lump-sum construction contract with an estimated bid value of $43,426,081, requiring a 10% bid bond, 100% payment bond, and 100% performance bond. As of July 26, 2026, bidding remains open, with bids due August 19, 2026, at 2:00 PM Pacific Daylight Time.
Georgia Department of Transportation
State AgencyGA
Jul 13, 2026
Closes
Sep 25, 2026
The Georgia Department of Transportation (GDOT) is issuing a Request for Qualifications (PNA 484-081326) seeking a qualified consultant firm to provide Construction Engineering and Inspection (CEI) services for the US 278 Grade Separation over CSX Railroad project. The selected consultant will be responsible for quality assurance of construction inspection, materials sampling and testing, documentation, general contract compliance monitoring, auditing, testing, documenting, and compliance verification of the contractor's construction work. The project requires prequalification with GDOT in specific area classes including Construction Engineering and Supervision, Field Testing of Roadway Construction Materials, Rainfall and Runoff Reporting, and Field Inspection for Erosion Control.
CountyGA
Jul 10, 2026
Closes
Aug 14, 2026
Chatham County, Georgia is requesting Statements of Qualifications from consulting firms to provide engineering design services for the President Street Grade Separation Project. The scope includes designing a grade-separated crossing carrying East President Street over Bilbo Canal and the CSX Railroad, along with roadway, drainage, utility, and traffic operations improvements; the County will administer the project with participation from the City of Savannah and coordination with GDOT and CSX. A pre-qualification meeting is scheduled for July 29, 2026, and responses are due August 14, 2026.