MidAmerica Saint Louis Airport
Special DistrictIL
Posted
Sep 2, 2026
Oct 6, 2026
Terminal Apron Expansion - Project 1 - Request for Proposals
Terminal apron expansion.
Description: Provide infrastructure and expansion - well and phase 1D project. The purpose of the 1B1D Project has two primary elements; the first is to cool, disinfect, and blend the Trinity Well #1 groundwater with the existing EWCWTP's finished water (Phase 1B work) and the second is to increase water treatment capacity by up to 13 MGD (Phase 1D work).
SpecialDistrict · TX, US
Original attachments and procurement documents tied to this bid.
Adjacent opportunities open for bidding right now.
MidAmerica Saint Louis Airport
Special DistrictIL
Posted
Sep 2, 2026
Oct 6, 2026
Terminal apron expansion.
CityCA
Posted
Aug 18, 2026
Sep 30, 2026
The project consists of lining, repairing, and improving sewer infrastructure at various locations Citywide.
CityCA
Posted
Sep 11, 2026
Oct 22, 2026
Requesting proposals from qualified engineering consulting firms to provide professional engineering services for the evaluation and design of improvements to the city's well 24 water facility.
CityNY
Posted
Aug 3, 2026
Oct 22, 2026
Provide professional engineering firms to provide final design, permitting, bidding assistance, state environmental quality review act (seqr) services, and full-time construction oversight (resident engineering inspection) services for the downtown mall green infrastructure improvements project.
Decision makers connected to this RFP from Brazos River Authority.