Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Procurement of support clamps, plastic service tees, and fittings.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work includes New 9.25 MGD lift station; 18” ID circular wet well with Canopy Covering and Trolley Hoist; 3 submersible pumps with VFDs; New CMU Electrical Building; New Generator Site Improvements, Grading, and Paving; Installation of 24” HDPE (DR-17) force main by open-cut and trenchless methods; Furnish and Install thirteen (13) 2” combination air release/ vacuum valves; Furnish and Install four (4) 24” direct bury plug valves; Furnish and Install 6" Force Main Lateral including 6" Plug Valve, 2" CAV, 6" MJ End Cap, Couplings, Fittings Tees, Concrete Structure, and Backfill Material; Furnish and Install 2" Force Main Lateral including 2" Plug Valve, 2" CTS Compression End Cap, Couplings, Fittings, Tees, Concrete Structure, and Backfill Material; Furnish and Install 3" Force Main Lateral including 3" Plug Valve, 3" MJ End Cap, Couplings, Fittings, Tees, Concrete Structure, and Backfill Material; Including but not limited to, clearing and grubbing, hydromulch and seeding, dewatering, hydrostatic testing, and pavement replacement; Demolition of existing lift station.;
Posted Date
Nov 23, 2025
Due Date
Jan 21, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Release: Nov 23, 2025
Close: Jan 21, 2026
Work includes New 9.25 MGD lift station; 18” ID circular wet well with Canopy Covering and Trolley Hoist; 3 submersible pumps with VFDs; New CMU Electrical Building; New Generator Site Improvements, Grading, and Paving; Installation of 24” HDPE (DR-17) force main by open-cut and trenchless methods; Furnish and Install thirteen (13) 2” combination air release/ vacuum valves; Furnish and Install four (4) 24” direct bury plug valves; Furnish and Install 6" Force Main Lateral including 6" Plug Valve, 2" CAV, 6" MJ End Cap, Couplings, Fittings Tees, Concrete Structure, and Backfill Material; Furnish and Install 2" Force Main Lateral including 2" Plug Valve, 2" CTS Compression End Cap, Couplings, Fittings, Tees, Concrete Structure, and Backfill Material; Furnish and Install 3" Force Main Lateral including 3" Plug Valve, 3" MJ End Cap, Couplings, Fittings, Tees, Concrete Structure, and Backfill Material; Including but not limited to, clearing and grubbing, hydromulch and seeding, dewatering, hydrostatic testing, and pavement replacement; Demolition of existing lift station.;
AvailableThe project generally consists of, but is not necessarily limited to, 2305 LF of 8" class 350 dip water main, 116 LF of 6" class 350 dip water main, 160 LF of bored 10-inch dr 11 d. I. P. S. Hdpe water main, 2140 LF of 1" sidr 7 hdpe water service, connections to existing 6" water mains, gate valves, bend, tees, reducers, and other fittings, fire hydrants, subbase, base, and 3" asphalt restoration, and landscape restoration.
Posted Date
Dec 9, 2025
Due Date
Jan 14, 2026
Release: Dec 9, 2025
Close: Jan 14, 2026
The project generally consists of, but is not necessarily limited to, 2305 LF of 8" class 350 dip water main, 116 LF of 6" class 350 dip water main, 160 LF of bored 10-inch dr 11 d. I. P. S. Hdpe water main, 2140 LF of 1" sidr 7 hdpe water service, connections to existing 6" water mains, gate valves, bend, tees, reducers, and other fittings, fire hydrants, subbase, base, and 3" asphalt restoration, and landscape restoration.
AvailableInstallation of over 600 LF of 6" diameter Class 50 ductile iron water main complete with the installation of new gate valves, permanent blow off assembly and all required fittings, bends, tees, and appurtenances. Work also includes the installation of a fire hydrant assembly, reconnection of five water services with pressure reducing valves, the abandonment of existing water main in-place, the installation, maintenance, and removal of temporary traffic control and erosion control measures, tree removal, rock excavation, and the removal and replacement of existing fences, landscaping, and gravel surfaces.
Posted Date
Dec 31, 2025
Due Date
Jan 27, 2026
Release: Dec 31, 2025
Close: Jan 27, 2026
Installation of over 600 LF of 6" diameter Class 50 ductile iron water main complete with the installation of new gate valves, permanent blow off assembly and all required fittings, bends, tees, and appurtenances. Work also includes the installation of a fire hydrant assembly, reconnection of five water services with pressure reducing valves, the abandonment of existing water main in-place, the installation, maintenance, and removal of temporary traffic control and erosion control measures, tree removal, rock excavation, and the removal and replacement of existing fences, landscaping, and gravel surfaces.