Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Upgraded or new ADA accessible sidewalks, pedestrian and bicyclist safety improvements, landscaping improvements, improved lighting, enhanced and safer crosswalks, and new drainage elements.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Safe routes to school. This effort will include monolithic drive over curb, gutter, and sidewalk installation, an ADA ramp, and asphalt patching.
Posted Date
Dec 30, 2025
Due Date
Feb 2, 2026
Release: Dec 30, 2025
Close: Feb 2, 2026
Safe routes to school. This effort will include monolithic drive over curb, gutter, and sidewalk installation, an ADA ramp, and asphalt patching.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide construction engineering & inspection services for safe routes to school.
Posted Date
Dec 11, 2025
Due Date
Jan 15, 2026
Release: Dec 11, 2025
Close: Jan 15, 2026
Provide construction engineering & inspection services for safe routes to school.
AvailableThe City of Thomasville seeks progressive design-build services, including professional park and infrastructure design, pre-construction consulting, and construction services for the Paradise Park Phase II Project.
Posted Date
Dec 19, 2025
Due Date
Jan 23, 2026
Release: Dec 19, 2025
Close: Jan 23, 2026
The City of Thomasville seeks progressive design-build services, including professional park and infrastructure design, pre-construction consulting, and construction services for the Paradise Park Phase II Project.
AvailableThe Village of Poland (Mahoning County, OH) seeks a consultant to prepare construction contract plans and related design services for the MAH_POL Safe Routes to School project (PID 124779), including new sidewalks, high-visibility crosswalks, an RRFB, and pedestrian signals along SR 224, SR 170, and local streets. Work includes environmental documentation, subsurface utility location, right-of-way acquisition services, and compliance with federal requirements; period of performance is estimated to begin March 2026 with construction completion targeted by December 2027. The procurement is being handled through ODOT Local Lettings/Consultant services and requires ODOT prequalification in relevant categories; it is a solicitation for consultant services (not a grant) and was listed as open with a response deadline on 2026-01-16.
Posted Date
Jan 8, 2026
Due Date
Jan 16, 2026
Release: Jan 8, 2026
Close: Jan 16, 2026
The Village of Poland (Mahoning County, OH) seeks a consultant to prepare construction contract plans and related design services for the MAH_POL Safe Routes to School project (PID 124779), including new sidewalks, high-visibility crosswalks, an RRFB, and pedestrian signals along SR 224, SR 170, and local streets. Work includes environmental documentation, subsurface utility location, right-of-way acquisition services, and compliance with federal requirements; period of performance is estimated to begin March 2026 with construction completion targeted by December 2027. The procurement is being handled through ODOT Local Lettings/Consultant services and requires ODOT prequalification in relevant categories; it is a solicitation for consultant services (not a grant) and was listed as open with a response deadline on 2026-01-16.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →