Install all materials, equipment, and incidentals required as described in the Specifications and listed below: • Installation of three (3) stainless steel slide gates complete with electric actuators as outlined in the Stainless Steel Slide Gates QC SM Specifications. The 3 stainless steel slide gates have already been purchased. Removal of three (3) existing stainless steel gates will be required. • Installation of two (2) step screen systems, including two (2) washer compactors complete with discharge tubes and bypass, two (2) conveyors, motorized and control panels as outlined in the Headworks Screening System Specifications. Removal of existing bar screens will be required. • Installation of two (2) aerated grit systems, including two (2) grit tank extraction conveyors, two (2) self-priming pumps, two (2) aeration headers and diffuser assembly, one grit classifier complete with two (2) hydrocyclones, and grit chute, and one (1) conveyor, and control panels as outlined in the Grit Removal Equipment Specifications. Removal of existing grit chamber equipment will be required. • Demolition and renovation of HVAC equipment including the installation of condensing unit, ductwork, grill, and pressure relief assembly. • Electrical and instrumentation upgrades and installations including: o Cable tray installations. o MCC demolition and rearrangement. o UPS installation. o PLC wiring. • Concrete rehabilitation of channel walls and grit chambers.