Retrieving RFP details
Release
Close
City of Santa Barbara
The City of Santa Barbara seeks proposals for constructability review, construction management, labor compliance, acceptance testing, and monitoring/inspection services for the Carpinteria Street Bridge Replacement Project. The project replaces a structurally deficient timber bridge and includes utility relocations, concrete and roadway work, stormwater improvements, lighting, and riparian habitat protection, with proposals due December 4, 2025 at 3:00 PM PST.
City of Chesapeake
Provide project management and construction inspection services for construction projects; consultant, employing qualified, competent and experienced personnel, shall perform the services set forth herein providing services equal to the practice prevalent by consultants practicing within the subject area of work and commensurate with the magnitude and intricacy of the work under consideration. These services shall be so complete that it will not be necessary for the city to supplement any of the operation by its own personnel, except as noted hereinafter. See outside link.
City of Palm Springs
Work consists of widening the bridge from a 4-lane arterial to a 6-lane arterial, with three lanes in each direction. The project includes seismic retrofitting, installation of new bridge barriers, bridge supports within the channel, and the addition of a 5-foot sidewalk on the north side and a 10-foot-wide multipurpose trail with a physical barrier for bicyclists on the south side. Includes comprehensive construction management services for the Ramon road bridge at whitewater river project. This includes developing project staging and traffic control plans, implementing a quality assurance program (including materials testing and inspection), reviewing construction surveying, ensuring environmental compliance, and conducting public outreach.
Placer Co Water Agency
Placer County Water Agency seeks a consultant to provide comprehensive construction management and inspection services for the Ophir Water Treatment Plant project. Services include pre‑construction support, administration, field and specialty inspection, materials testing, schedule and change management, documentation, compliance, and safety oversight.
Release
Nov 06, 2025
Close
Dec 04, 2025