Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Montana Department of Transportation issued an RFP (MDT-RFP/RFQ-2026-2146) seeking consulting firms to prepare construction plans and specifications for the Eagle Pass Trail-South project. The scope covers engineering services to produce detailed construction plans and specifications in compliance with applicable standards. The solicitation was posted on 2026-01-07 and proposals are due by 2026-02-04.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Teton County is soliciting proposals for Construction Manager at Risk (CMAR) services for the Teton Pass Trail Pathway Project, which includes constructing a multi-use pathway up to ~18,900 linear feet with retaining walls, handrails, drainage, erosion control, revegetation, and potentially a precast box culvert under WY Highway 22. The selected CMAR will provide preconstruction services and may provide construction services under a Guaranteed Maximum Price (GMP) once scope and funding are finalized. The project follows the south side of WY-22 from the Idaho Teton Pass Trail terminus toward a potential new pedestrian underpass connecting to Coal Creek Trailhead.
Posted Date
Jan 7, 2026
Due Date
Jan 29, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Close: Jan 29, 2026
Teton County is soliciting proposals for Construction Manager at Risk (CMAR) services for the Teton Pass Trail Pathway Project, which includes constructing a multi-use pathway up to ~18,900 linear feet with retaining walls, handrails, drainage, erosion control, revegetation, and potentially a precast box culvert under WY Highway 22. The selected CMAR will provide preconstruction services and may provide construction services under a Guaranteed Maximum Price (GMP) once scope and funding are finalized. The project follows the south side of WY-22 from the Idaho Teton Pass Trail terminus toward a potential new pedestrian underpass connecting to Coal Creek Trailhead.
AvailableDESIGN/BUILD: Design and construct the trail reroute behind the Water Treatment Plant. The project is to include 8' wide, 5' thick concrete trail with approximately 2,010 FT long, along with a footbridge. Trail will maintain a 75 FT buffer from the creek. Footbridge will consist of 60' x 8' wide timber boardwalk with HDPE decking and concrete abutments. Project will include all clearing, grading and finishing work with erosion control.
Posted Date
Dec 15, 2025
Due Date
Jan 13, 2026
Release: Dec 15, 2025
Close: Jan 13, 2026
DESIGN/BUILD: Design and construct the trail reroute behind the Water Treatment Plant. The project is to include 8' wide, 5' thick concrete trail with approximately 2,010 FT long, along with a footbridge. Trail will maintain a 75 FT buffer from the creek. Footbridge will consist of 60' x 8' wide timber boardwalk with HDPE decking and concrete abutments. Project will include all clearing, grading and finishing work with erosion control.
AvailableDesign/build services for trail drainage improvement project.
Posted Date
Dec 5, 2025
Due Date
Jan 22, 2026
Release: Dec 5, 2025
Close: Jan 22, 2026
Design/build services for trail drainage improvement project.
AvailableThis Invitation for Bids is for trail repair services within the South Brook/Lake Wyola Conservation Area in Shutesbury, Massachusetts.
Posted Date
-
Due Date
Feb 12, 2026
Close: Feb 12, 2026
This Invitation for Bids is for trail repair services within the South Brook/Lake Wyola Conservation Area in Shutesbury, Massachusetts.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →