School DistrictCA
Posted
Oct 30, 2026
Dec 18, 2026
RFP 27-110 Cabling Infrastructure - Erate YR 2027 (YR30)
Cabling infrastructure, including single-mode fiber and related equipment, for four Loomis Union School District school sites.
Description: Auburn Union School District is soliciting proposals for Category Two cabling infrastructure (E-Rate Year 2027) to install CAT6 (or equivalent) cabling and supply specified equipment at two school sites. The work includes pulling approximately 200 feet of CAT6 from IDFs to classrooms, providing listed rack, cable management, wall-mounted enclosure and an access point, and meeting manufacturer warranties and certification requirements. The district requires the entire project be completed by September 30, 2028 and awards are contingent on E-Rate funding and Board approval.
SchoolDistrict · CA, US
Adjacent opportunities open for bidding right now.
School DistrictCA
Posted
Oct 30, 2026
Dec 18, 2026
Cabling infrastructure, including single-mode fiber and related equipment, for four Loomis Union School District school sites.
Dry Creek Joint Elementary School District
School DistrictCA
Posted
Oct 19, 2026
Dec 1, 2026
Supply and install CAT6 (or equivalent) cabling infrastructure and associated equipment at four school sites, including removal of existing wiring, labeling, testing, and certification.
Elverta Joint Elementary School District
School DistrictCA
Posted
Nov 13, 2026
Jan 8, 2027
Elverta Joint Elementary School District is soliciting proposals to install cabling infrastructure across its school sites, including CAT6/CAT6A and approximately 1,000 feet of single-mode fiber from the MDF to IDF cabinets. The work includes polishing, terminating and testing fiber with LC connectors, removal of existing wiring, labeling and certification of all runs, provision of as-built drawings and test results, and delivery of specified warranties and manufacturer guarantees. Bidders must meet E-rate service provider requirements (SPIN, FRN, FCC Green Light), hold required licenses/certifications (C-7 license, BICSI RCDD and technicians), carry specified insurance and bonds, and complete the project by August 1, 2027 if awarded and funded.
Dry Creek Joint Elementary School District
School DistrictCA
Posted
Oct 19, 2026
Dec 1, 2026
Procurement of 14 Erate-eligible UPS units, specified as APC Smart-UPS C SMC1500C or equivalent.
Decision makers connected to this RFP from Auburn Union School District.
From the first pre-RFP signals to the published RFP and its files.
Board meeting
228 days before RFP
District IT staff reported planned summer replacement of 52 aging Wi-Fi access points and improvements to school network infrastructure.
there. So, some of the things that we've been doing this last year, um, we are implementing an allnew flash storage system. Um, back in 2019, I put in a proof of concept of storage and clustering computers, not to get too high level, but, uh, that stuff has held on for quite a few years now. And so, um, we we're replacing that with new flash faster, uh,…
Auburn Union School District Regular Board Meeting
Board meeting · Apr 9, 2026
AUSD ZOOM: We're refreshing. 52 new wireless access points. Say things on the ceiling. We have 52 that are aging this year, and another, I think, 50 aging next year. So that's a ongoing upgrade. AUSD ZOOM: We're putting in a new fiber optic cable at auburn elementary to support a an area that has overly grown with network and never had been…
AUSD Regular Board Meeting
Board meeting · Mar 13, 2025
RFP published
Proposals due (46 days left)