Leak Detection Study (Request for Qualifications)
Provide leak detection study.
Description: Perform a comprehensive leak detection survey of approximately 372 miles of water transmission and distribution mains to identify, verify, and document leaks throughout the system.
City · AR, US
Adjacent opportunities open for bidding right now.
CityTX
Posted
Nov 12, 2026
Dec 8, 2026
Provide leak detection study.
Headwaters Soil And Water Conservation District
Special DistrictVA
Posted
Oct 30, 2026
Dec 3, 2026
The rehabilitation of various sewer collection systems within augusta county. The trenchless pipe rehabilitation of 10,653. 0 LF of 8”, 708. 0 LF of 10”, and 123. 0 LF of 12” sanitary sewer main utilizing cured in place pipe (cipp) or an acceptable alternative approved by owner. Total footage to be lined is 11,484. 0 LF with 108 lateral reinstatements. A) these technical specifications include the minimum requirements for the rehabilitation of sanitary sewer pipelines by the installation of cured-in-place pipe (cipp) within the existing, deteriorated pipe as shown on the maps included as part of this solicitation. B) the rehabilitation of pipelines shall be done by the installation of a resin-impregnated flexible tube which, when cured, shall be continuous and tight-fitting throughout the entire length of the original pipe. The cipp shall extend the full length of the original pipe and provide a structurally sound, joint-less and water-tight new pipe within the original pipe. The bidder is responsible for proper, accurate and complete installation of the cipp using the system selected by the bidder. C) neither the cipp system, nor its installation, shall cause adverse effects to any of the owner’s processes or facilities. The use of the product shall not result in the formation or production of any detrimental compounds or by-products at the wastewater treatment plant. The bidder shall notify the owner and identify any by-products produced as a result of the installation operations, test and monitor the levels, and comply with any and all local waste discharge requirements. The bidder shall cleanup, restore existing surface conditions and structures, and repair any of the cipp system determined to be defective. The bidder shall conduct installation operations and schedule cleanup in a manner to cause the least possible obstruction and inconvenience to traffic, pedestrians, businesses, and property owners or tenants.
CityCA
Posted
Aug 7, 2026
Nov 19, 2026
Provide water distribution system sample collection and laboratory analysis services.
State AgencyIN
Posted
Oct 16, 2026
Nov 20, 2026
Provide industrial water treatment services includes monthly service of cooling tower, boiler, and chilled and hot loop systems in the commission's coliseum.
Decision makers connected to this RFP from City of Bentonville.
From the first pre-RFP signals to the published RFP and its files.
Budget
The FY2025 budget reported $2 million encumbered for water-leak repairs and estimated an additional $6 million in water repairs was needed through the end of 2025.
Since 2024 we have been conducting studies which seek to identify and align both our water and electricity rates. We are actively pursuing both studies to aim at identifying and balancing out our capital growth needs alongside our revenue recovery. During 2024, the city began a more aggressive approach to this issue when a water study indicated that our…
City of Bentonville FY2025 Budget
Budget · 2025
Budget
The City planned to continue implementing and maintaining district metering areas to find non-surfacing water leaks in 2025.
2025 Goals and Objectives • Continue to provide safe and reliable drinking water to the citizens of Bentonville while meeting all regulatory standards and ensuring capacity for growth. • Continue to operate and maintain the City's sewer system while meeting all regulatory standards and ensuring capacity for growth. • Continue to locate and replace failing…
City of Bentonville FY2025 Budget
Budget · 2025
RFP published
Proposals due (10 days left)
• Continue to identify, test, and change out defective meters to ensure we are not losing water through them. • Continue to implement and maintain DMAs to help find water leaks that aren't surfacing. • Complete the implementation of CityWorks.
City of Bentonville FY2026 Budget
Budget · 2026