Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Town of Camp Verde is soliciting professional engineering services to design replacement of approximately 1,500 linear feet of 12" ductile iron watermain along Moonrise Drive, including field investigation, design, permitting, and construction-phase support. The selected consultant will produce bid-ready documents, coordinate utilities and permitting (ADEQ), and provide construction support; the aggregator lists an estimated budget range of $750,000–$1,500,000.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Conducting a Project Development & Environment (PD&E) study to evaluate the proposed replacement of the Drive bridge.
Posted Date
Oct 23, 2023
Due Date
Jul 1, 2026
Release: Oct 23, 2023
Close: Jul 1, 2026
Conducting a Project Development & Environment (PD&E) study to evaluate the proposed replacement of the Drive bridge.
AvailablePremium
Access the largest public sector contact database
RFP for the replacement of doors and windows at the Founders Park Ron Levy Aquatic Center.
Posted Date
Dec 8, 2025
Due Date
Jan 7, 2026
Release: Dec 8, 2025
Close: Jan 7, 2026
RFP for the replacement of doors and windows at the Founders Park Ron Levy Aquatic Center.
AvailableWork consists of generator replacement project. Provide a full replacement and upgrade the existing primary power distribution (main switchboard). Scope includes decommissioning of the existing emergency generator, selective demolition of unused conductors and conduit, fuel pumps, exhaust pipes, disposal of oil, fuel and any other chemicals.
Posted Date
Aug 22, 2025
Due Date
Jan 9, 2026
Release: Aug 22, 2025
Close: Jan 9, 2026
Work consists of generator replacement project. Provide a full replacement and upgrade the existing primary power distribution (main switchboard). Scope includes decommissioning of the existing emergency generator, selective demolition of unused conductors and conduit, fuel pumps, exhaust pipes, disposal of oil, fuel and any other chemicals.
AvailableDesign-Bid-Build. To provide Comprehensive Construction Management and Inspection Services (CMIS) for the Shoreline Drive Realignment Project the Shoreline Drive Realignment Project (Project), a transformative infrastructure initiative designed to reconnect Downtown Long Beach and improve multimodal transportation options. This high-visibility project funded in part by a federal Reconnecting Communities Program grant will realign Shoreline Drive, remove outdated infrastructure barriers, and construct new pedestrian and bicycle-friendly routes.
Posted Date
Nov 11, 2025
Due Date
Jan 8, 2026
Release: Nov 11, 2025
Close: Jan 8, 2026
Design-Bid-Build. To provide Comprehensive Construction Management and Inspection Services (CMIS) for the Shoreline Drive Realignment Project the Shoreline Drive Realignment Project (Project), a transformative infrastructure initiative designed to reconnect Downtown Long Beach and improve multimodal transportation options. This high-visibility project funded in part by a federal Reconnecting Communities Program grant will realign Shoreline Drive, remove outdated infrastructure barriers, and construct new pedestrian and bicycle-friendly routes.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis