Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project includes watermain replacement.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Installation of a new replacement water line for a portion of an existing 10" cast iron water distribution main. The replacement line will be 12" and approx. 4,100 LF in length. Landscape areas, curb and gutter, asphalt, and other items to be restored to pre-construction conditions.
Posted Date
Jan 14, 2026
Due Date
Feb 13, 2026
Release: Jan 14, 2026
Close: Feb 13, 2026
Installation of a new replacement water line for a portion of an existing 10" cast iron water distribution main. The replacement line will be 12" and approx. 4,100 LF in length. Landscape areas, curb and gutter, asphalt, and other items to be restored to pre-construction conditions.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes the replacement of a culvert, approx. 1300 feet. The existing dual elliptical pipe culvert will be replaced with a new, 4-sided box culvert. Additional work consists of watermain replacement and roadway approach reconstruction. An off-site detour will be utilized for the duration of construction.
Posted Date
Jan 9, 2026
Due Date
Feb 3, 2026
Release: Jan 9, 2026
Close: Feb 3, 2026
Work includes the replacement of a culvert, approx. 1300 feet. The existing dual elliptical pipe culvert will be replaced with a new, 4-sided box culvert. Additional work consists of watermain replacement and roadway approach reconstruction. An off-site detour will be utilized for the duration of construction.
AvailableThe City of Redding, California is soliciting proposals for construction management services for the Westside Road Bridge Over Canyon Hollow Creek Replacement Project.
Posted Date
Jan 14, 2026
Due Date
Feb 13, 2026
Release: Jan 14, 2026
Close: Feb 13, 2026
The City of Redding, California is soliciting proposals for construction management services for the Westside Road Bridge Over Canyon Hollow Creek Replacement Project.
AvailableConstruction of roundabout, drainage and watermain improvements, guardrail, concrete curb and gutter, signing and pavement markings at the intersection.
Posted Date
Jan 9, 2026
Due Date
Feb 6, 2026
Release: Jan 9, 2026
Close: Feb 6, 2026
Construction of roundabout, drainage and watermain improvements, guardrail, concrete curb and gutter, signing and pavement markings at the intersection.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →