Summary
Work includes parking lot rehabilitation, curb and sidewalk improvements, landscaping, electrical work, signage and wayfinding enhancements, pavement markings, and other related site improvements intended to improve traffic flow. Description: 1 LS of mobilization and general conditions (max 10%); 260 ft of curb and gutter, rem; 290 SYD of pvmt, rem., asphalt, less than 10"; 270 sq ft; 50 SYD of landscape, rem; 280 CYD of excavation, earth; 40 CYD of subgrade undercutting, type II; 20 CYD of subgrade undercutting, type IV; 190 ft of erosion control, silt fence; 4 EA of erosion control, inlet protection, fabric drop; 190 CYD of aggregate base course, mdot 21aa; 670 SYD of geotextile, separator, non-woven. See attached file.