Special DistrictTX
Posted
-
Oct 20, 2026
Water Plant No. 1 Water Disinfection System Improvements RFP
The system will use liquid ammonium sulfate and sodium hypochlorite to disinfect the water pumped.
Description: This project will include the installation of a water disinfection system to provide long-term disinfection. The new permanent system will be in place of the current temporary system in building #1, which will be removed when the temporary permit expires. The proposed system will present the option to switch to a lower dose but will be adjustable based on startup of the system and changing conditions.
StateAgency · NH, US
Solicitation files and supporting documents for this bid.
Adjacent opportunities open for bidding right now.
Special DistrictTX
Posted
-
Oct 20, 2026
The system will use liquid ammonium sulfate and sodium hypochlorite to disinfect the water pumped.
Higher EducationLA
Posted
Oct 13, 2026
Nov 5, 2026
Provide supplying, set-up, training, services, maintenance, etc. Of a new chronos uv-c high-level disinfection chamber for endocavitary and external ultrasound probes etc.
Alabama Department of Environmental Management
State AgencyAL
Posted
Jul 30, 2026
Sep 30, 2027
Procurement of bi-annual maintenance services for the Evoqua Purified Water System at ADEM's Birmingham Field Office laboratory, including inspection, operational function logging, and replacement of expendables, chemicals, and filters.
Fredericksburg Sewer And Water Authority
Special DistrictPA
Posted
Aug 21, 2026
Oct 28, 2026
Contract No. 1 – Pipeline Construction: Construction of approx. 1,135 LF of 10", 6,570 LF of 8", and 876 LF of 6" PVC water mains, demolition or reconfiguration of water mains at multiple locations, disinfection of pipelines, and other incidental work as indicated in the Contract Documents. Contract No. 2 – General Construction: The work of this contract generally consists of the construction of a manganese filter building, rehabilitation of the existing office building and garage, physical installation of all process equipment, chemical feed equipment, sludge wasting equipment, water recycling equipment, backwash equipment, physical modifications at Well 6, equipment modifications at the water storage tanks, process piping, chemical spill drain piping, and other incidental work as indicated in the Contract Documents. Contract No. 3 – Electrical Construction: The work of this contract generally consists of furnishing and installing electrical power supply and distribution equipment, standby electrical power generation equipment, electrical conduits and wiring for all process and other powered equipment provided under all other contracts, electrical upgrade of Well 6, installation of well controls at new wells 7 & 8, electrical installation of a mixer in the West Water Tower, demolition of the electrical service to the existing mixers in both water towers, and other incidental work as indicated in the Contract Documents. Contract No. 4 – Plumbing Construction: The work of this contract generally consists of furnishing and installing domestic cold and hot water supply piping, fixtures, accessories, point-of-use water heaters, sanitary waste and vent piping, and other incidental work as indicated in the Contract Documents. Contract No. 5 – HVAC Construction: The work of this contract generally consists of furnishing and installing heating and ventilation equipment in the proposed filter and refurbished office buildings, including air conditioning and heating units, compressor, electric unit heaters, gas unit heaters, propane tank and piping, and other related incidental work as indicated in the Contract Documents.
Decision makers connected to this RFP from New Hampshire Department of Military Affairs and Veterans Services.