RFB-72-27 DMA - DANVILLE RC ROOF REPAIR
RFB-72-27 DMA - DANVILLE RC ROOF REPAIR seeks bids to re-cover the existing roof at the Danville Readiness Center with a new 2-ply recover roof system. The system will use 2-ply SBS modified bitumen roofing applied with cold adhesive over new 1/2-inch gypsum cover board, with existing roof wrinkles and surface defects cut out before installation. The work also includes new prefinished metal gutters, downspouts, fascia, flashings, blocking, roof splashes, accessories, and terminations, with an estimated project duration of 90 days for substantial completion plus 30 days for final completion.