Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Procurement of general contractor services for the replacement of the WC-2 Flood Control Structure, including construction of concrete weirs and rip-rap.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes 2,242 sf removal of existing cement bags; 343 tn riprap; 170 lf floating turbidity barriers; 1,020 lf silt fencing; 1 ls access road temporary construction and removal; 1 ls dewatering of bays; 4 ea weir gate removal; 12 cy weir concrete; 2. 9 cy bridge foundation concrete; 68 lf pedestrian guardrail; 90 sf concrete spall repairs; 200 lf concrete crack repairs.
Posted Date
Dec 5, 2025
Due Date
Jan 13, 2026
Release: Dec 5, 2025
Close: Jan 13, 2026
Work includes 2,242 sf removal of existing cement bags; 343 tn riprap; 170 lf floating turbidity barriers; 1,020 lf silt fencing; 1 ls access road temporary construction and removal; 1 ls dewatering of bays; 4 ea weir gate removal; 12 cy weir concrete; 2. 9 cy bridge foundation concrete; 68 lf pedestrian guardrail; 90 sf concrete spall repairs; 200 lf concrete crack repairs.
AvailableRemovals, grading, aggregate, structure replacement, erosion control, permanent signing, traffic control, restoration.
Posted Date
Jan 6, 2026
Due Date
Feb 10, 2026
Release: Jan 6, 2026
Close: Feb 10, 2026
Removals, grading, aggregate, structure replacement, erosion control, permanent signing, traffic control, restoration.
AvailableRemovals, grading, aggregate, asphalt pavement, structure replacement, culvert pipe, erosion control, permanent signing, traffic control, restoration.
Posted Date
Jan 6, 2026
Due Date
Feb 10, 2026
Release: Jan 6, 2026
Close: Feb 10, 2026
Removals, grading, aggregate, asphalt pavement, structure replacement, culvert pipe, erosion control, permanent signing, traffic control, restoration.
AvailableProject includes of electrical power modification and replacement, replacement of existing 480V Switchboard No. 3 (SWBD-3), replacement of existing 480V Motor Control Center No. 25 (MCC-25), re-feed of 480V power from SWBD-3 to MCC No. 30 (MCC-30).
Posted Date
Jan 24, 2022
Due Date
Jan 15, 2026
Release: Jan 24, 2022
Close: Jan 15, 2026
Project includes of electrical power modification and replacement, replacement of existing 480V Switchboard No. 3 (SWBD-3), replacement of existing 480V Motor Control Center No. 25 (MCC-25), re-feed of 480V power from SWBD-3 to MCC No. 30 (MCC-30).
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →