Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes 2,242 sf removal of existing cement bags; 343 tn riprap; 170 lf floating turbidity barriers; 1,020 lf silt fencing; 1 ls access road temporary construction and removal; 1 ls dewatering of bays; 4 ea weir gate removal; 12 cy weir concrete; 2. 9 cy bridge foundation concrete; 68 lf pedestrian guardrail; 90 sf concrete spall repairs; 200 lf concrete crack repairs.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Removals, grading, aggregate, structure replacement, erosion control, permanent signing, traffic control, restoration.
Posted Date
Jan 6, 2026
Due Date
Feb 10, 2026
Release: Jan 6, 2026
Close: Feb 10, 2026
Removals, grading, aggregate, structure replacement, erosion control, permanent signing, traffic control, restoration.
AvailableRemovals, grading, aggregate, asphalt pavement, structure replacement, culvert pipe, erosion control, permanent signing, traffic control, restoration.
Posted Date
Jan 6, 2026
Due Date
Feb 10, 2026
Release: Jan 6, 2026
Close: Feb 10, 2026
Removals, grading, aggregate, asphalt pavement, structure replacement, culvert pipe, erosion control, permanent signing, traffic control, restoration.
AvailableRemovals, grading, aggregate, asphalt pavement, structure replacement, culvert pipe, erosion control, permanent signing, traffic control, restoration.
Posted Date
Jan 6, 2026
Due Date
Feb 10, 2026
Release: Jan 6, 2026
Close: Feb 10, 2026
Removals, grading, aggregate, asphalt pavement, structure replacement, culvert pipe, erosion control, permanent signing, traffic control, restoration.
AvailableRelease: Dec 30, 2025
Close: Jan 20, 2026
Small structure replacement project.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis