Summary
The City of Waco Infrastructure Services Department, in coordination with the Texas Department of Transportation (TxDOT), is soliciting sealed bids under solicitation RFB 2026-023 for the Speegleville Bridge Over Middle Bosque Replacement, a 0.54-mile bridge and roadway reconstruction project on Speegleville Road from Maple Shade Road to north of Oak Road in McLennan County, Texas. The project consists of reconstructing approximately 2,200 linear feet of roadway to a four-lane configuration with a striped median, constructing two new 670-foot bridges over the Middle Bosque River, installing approximately 1,500 LF of storm drainpipes and culverts, and adding pedestrian sidewalks on both sides of the roadway. Sealed bids are due by 2:00 PM CDT on July 29, 2026, with a non-mandatory pre-bid meeting held via Zoom on July 1, 2026, and questions due by 5:00 PM CDT on July 15, 2026.