Retrieving RFP details
Release
Close
Wisconsin Department of Administration
In general, the work consists of: removing the existing sidewalk and retaining wall, constructing a new concrete retaining wall, replacing the sidewalk, installing a storm inlet and trench drain, and regrading the disturbed area and restoration of disturbed area on the west side of Fricker Hall.
Retaining Wall and Storm Water Improvements
zip
City of Pevely
Work includes storm water improvements within the city and provides for storm sewer pipe and structure installation, wall construction, fence relocation, restoration, traffic control and other incidental items and work.
Kent County
Work includes 15,800 LF of 30" concrete storm sewer; 2.7 miles of full road reconstruction; site and ecological improvements at detention basin; Expansion of existing detention basin; new parking lot at detention basin; 1,110 LF of steel sheet pile wall.
Wake County Public School System
Project consists of the following major items for the existing track improvements demolition/removal of existing retaining wall, pavement, fence, and storm drainage piping; removal of debris from existing storm drainage piping; CCTV of existing storm drainage piping; minor tree clearing; earth embankment repair; installation of new storm drainage piping and abandonment of existing piping; construction of new segmental retaining wall; installation of asphalt paving, curb and gutter, fencing and gates, seeding, and sod grass.
Release
Nov 11, 2025
Close
Dec 17, 2025