Work inlcudes renovation of the existing restroom facility with new fixtures, partitions, finishes and includes ada improvements in the building, a new water heater, led lighting and ventilation, it also includes the infill of existing screened areas with glazing. Adjacent to the restroom building there will be the reconfiguration of grades to create a new ada parking stall and ramps for access into the restroom and adjacent building.
Work inlcudes renovation of the existing restroom facility with new fixtures, partitions, finishes and includes ada improvements in the building, a new water heater, led lighting and ventilation, it also includes the infill of existing screened areas with glazing. Adjacent to the restroom building there will be the reconfiguration of grades to create a new ada parking stall and ramps for access into the restroom and adjacent building.
Work includes plumbing reinstallation: reinstall the salvaged water closets, urinals, faucets, and flush valves. Ensure all connections are secure. ; electrical: existing lighting is to remain as-is (protect during construction); hvac: existing hvac system is to remain as-is (protect during construction). ; fire life safety: owner will sub own contract to remove sprinkler line; final clean: thoroughly clean the entire restroom, including all new and existing floors, walls, and plumbing fixtures, upon project completion; all demolition or loud construction work (tile removal) to be performed on weekends;plumbing salvage: carefully remove and store existing water closets, urinals, faucets, and flush valves for reinstallation. See attached file.
Work includes plumbing reinstallation: reinstall the salvaged water closets, urinals, faucets, and flush valves. Ensure all connections are secure. ; electrical: existing lighting is to remain as-is (protect during construction); hvac: existing hvac system is to remain as-is (protect during construction). ; fire life safety: owner will sub own contract to remove sprinkler line; final clean: thoroughly clean the entire restroom, including all new and existing floors, walls, and plumbing fixtures, upon project completion; all demolition or loud construction work (tile removal) to be performed on weekends;plumbing salvage: carefully remove and store existing water closets, urinals, faucets, and flush valves for reinstallation. See attached file.
Base Bid: Renovate and update existing restrooms, laundry room, and replace existing HVAC system. Work includes demolition of existing architectural, plumbing, HVAC, fire sprinkler, fire alarm and electrical elements, and install new architectural, plumbing, HVAC fire sprinkler, fire alarm and electrical elements. Alternate 1 - Fire alarm replacement: Provide a full new bidder-designed, addressable fire alarm system to replace existing zoned system in its entirety. New system must comply with all local regulations and codes and include an annunciator panel in main lobby, combo CO/smoke detection in sleeping rooms, and smoke detection in all electrical and mechanical spaces. Alternate 2 - Downspout connection to existing tightline: Extend existing tightline and connect new down spouts to new tightline. Work includes extension of existing tightline, restoration of existing landscaping and replacement of existing pavement.
Base Bid: Renovate and update existing restrooms, laundry room, and replace existing HVAC system. Work includes demolition of existing architectural, plumbing, HVAC, fire sprinkler, fire alarm and electrical elements, and install new architectural, plumbing, HVAC fire sprinkler, fire alarm and electrical elements. Alternate 1 - Fire alarm replacement: Provide a full new bidder-designed, addressable fire alarm system to replace existing zoned system in its entirety. New system must comply with all local regulations and codes and include an annunciator panel in main lobby, combo CO/smoke detection in sleeping rooms, and smoke detection in all electrical and mechanical spaces. Alternate 2 - Downspout connection to existing tightline: Extend existing tightline and connect new down spouts to new tightline. Work includes extension of existing tightline, restoration of existing landscaping and replacement of existing pavement.