Summary
Work includes plumbing reinstallation: reinstall the salvaged water closets, urinals, faucets, and flush valves. Ensure all connections are secure. ; electrical: existing lighting is to remain as-is (protect during construction); hvac: existing hvac system is to remain as-is (protect during construction). ; fire life safety: owner will sub own contract to remove sprinkler line; final clean: thoroughly clean the entire restroom, including all new and existing floors, walls, and plumbing fixtures, upon project completion; all demolition or loud construction work (tile removal) to be performed on weekends;plumbing salvage: carefully remove and store existing water closets, urinals, faucets, and flush valves for reinstallation. See attached file.