CountyNM
Posted
Aug 31, 2026
Sep 30, 2026
Engineering / Consulting Services for the Kirtland Walk Path Phase III (Request for Qualifications)
Provide qualified engineering, surveying, and environmental consultants to provide the design and permitting services for the design of a multi-use path (mup), this project consists of topographic and boundary survey, utility investigations, preliminary and final engineering design, environmental investigation and documentation and preparation of construction documents.