Greater Dayton Regional Transit Authority
Special DistrictOH
Posted
Nov 4, 2026
Dec 2, 2026
Bus Manufacturing Inspection (Request For Quotation)
Seeking quotes for the performance of bus line manufacturing inspections.
Description: Procurement of services for the integration of bus shelter structures into existing bus stops in Whistler.
City · BC, CA
Adjacent opportunities open for bidding right now.
Greater Dayton Regional Transit Authority
Special DistrictOH
Posted
Nov 4, 2026
Dec 2, 2026
Seeking quotes for the performance of bus line manufacturing inspections.
FederalVA
Posted
Nov 15, 2026
Nov 23, 2026
Provide bus, conductor, NSN 6150014793773, Qty 26 UI Ea
CityKS
Posted
Sep 23, 2026
Dec 8, 2026
Construction of street crosswalk and bus stops.
Posted
Nov 12, 2026
Nov 24, 2026
The Contractor shall manufacture five (5) 3FT long, 133.33 amp, single phase "XLPOLYO" 1/C 600V low-smoke cable. Each cable to have a male LEVITON 16 black cam-lock on one end and a female DURALINE type 23 black cam-lock adapter on the opposite end. The Contractor shall manufacture five (5) 3FT long, 133.33 amp, single phase "XLPOLYO" 1/C 600V low-smoke cable. Each cable to have a male LEVITON 16 white cam-lock on one end and a female DURALINE type 23 white cam-lock adapter on the opposite end. The Contractor shall manufacture five (5) 3FT long, 133.33 amp, single phase "XLPOLYO" 1/C 600V low-smoke cable. Each cable to have a male LEVITON 16 red cam-lock on one end and a female DURALINE type 23 red cam-lock adapter on the opposite end.
Decision makers connected to this RFP from Resort Of Whistler.
From the first pre-RFP signals to the published RFP and its files.
Board meeting
361 days before RFP
The strategy lists creation of bus-stop access standards and a retrofit and implementation plan for year-round accessible bus shelters.
WHISTLER ACTIVE TRANSPORTATION STRATEGY 35 3535 Create and implement a communication / promotion program for visitors Create design standards and plan to improve access/egress to bus stops with appropriate facilities. Create a retrofit and implementation plan for year-round accessible bus shelters
Climate Action and Environment Committee Regular Meeting
Board meeting · Oct 20, 2025
Board meeting
206 days before RFP
The 2025 project-expenditure schedule recorded an $85,000 Transit Shelters budget with $61,357 spent.
Summary of Project Expenditures For the year ended December 31, 2025 (unaudited) Project Project Description 2025 Spent % spent Asset Maintenance & Capital Renewal B001 Municipal Hall 670,000 648,396 97% \* B003 Public Works Yard 460,000 415,804 90% \* B005 Library 161,000 137,562 85% \* B007 Fire Halls 220,000 218,353 99% \* B008 Other Buildings 228,200…
Resort Municipality Of Whistler Regular Meeting
Board meeting · Mar 24, 2026
Agenda packet
24 days before RFP
The progress report records a $400,000 provincial grant for up to seven neighbourhood bus shelters and planned detailed design and Development Permit work for 2027/2028, prioritizing Nesters Road and Legacy Way.
1.5 Continue to improve transit stop infrastructure such as shelters, benches, and accessibility. $400,000 Provincial grant to provide up to seven bus shelters for neighbourhood stops. Next steps are to complete detailed design and Development Permit for installation in 2027/2028. Nesters Road and Legacy way stops will be prioritized first.
Resort Municipality of Whistler Municipal Council Regular Meeting
Agenda packet · Sep 22, 2026
RFP published
Proposals due (10 days left)