REQUEST FOR QUALIFICATIONS FOR PHASE II DESIGN ENGINEERING SERVICES FOR 22-00137-00-MS OGDEN AVENUE CORRIDOR IMPROVMENTS PROJECT
Description: The Village of Brookfield, Illinois is soliciting qualifications from qualified engineering firms to provide Phase II Design Engineering Services for the federally funded Ogden Avenue Corridor Improvements project (22-00137-00-MS). The procurement seeks firms to perform design engineering work as described in the Project Overview, Description of Project Scope, and Scope of Services documents. Submittal requirements include physical copies in a sealed envelope and an emailed PDF of qualifications, and selection will be by qualifications-based selection per the solicitation instructions.
See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
The Village of Brookfield is requesting qualifications from engineering firms to provide Phase II design engineering services for the federally funded Ogden Avenue Corridor Improvements Project (Project No. 22-00137-00-MS). The work will include preparation of Phase II design documents and related engineering services as described in the Project Overview, Scope of Services, and Submittal Requirements. Firms must obtain the project documents by request to the Public Works Director and submit qualifications in the required hard-copy and electronic formats by the stated deadline.
Accepting statements of interest for Phase III engineering services covering the resurfacing of road. Phase III engineering services shall include construction inspection, documentation, and coordination during the resurfacing of road, including the pavement grinding and resurfacing, curb and gutter replacement, ADA curb ramp upgrades, and necessary drainage structure adjustments. The consultants work includes, but is not limited to, providing staff, vehicles, and appropriate test equipment to complete Phase III engineering for the project.
Provide engineering and technical services necessary for project development and implementation, including preliminary assessments, engineering design, preparation of plans and specifications, cost estimates, bidding assistance, construction administration, inspection, and project closeout.
Key Contacts on this RFP
Decision makers connected to this RFP from Village of Brookfield.
From the first pre-RFP signals to the published RFP and its files.
Board meeting
429 days before RFP
The Village Board adopted the Energize Ogden corridor plan in June 2022.
See sourceHide source
Ogden Avenue. Um which actually started in 2021. We came to the village board. We had several discussions staff and the board with let's develop a plan and a strategy to try to improve the corridor of Ogden Avenue to make it serve as a catalyst and as a amenity that the community wants and enjoys. So the board accepted that recommendation and and and…
The draft FY2026 budget includes a proposed $350,000 line for an engineering consultant for Ogden Avenue Corridor Improvements.
See sourceHide source
OGDEN AVENUE TIF FUND VILLAGE OF BROOKFIELD DRAFT ANNUAL OPERATING BUDGET FOR THE CALENDAR YEAR 2026 133 Account Account Description 2023 Actual Amount 2024 Actual Amount 2025 Adopted Budget 2025 Actual Amount 2025 Estimated Amount 2026 Department Calculated Column 1 Fund 15 - OGDEN AVENUE TIF REVENUE Department 00 - NON-DEPARTMENTAL Division 00 -…
The Village recorded Ogden Avenue Phase I planning and reported approved Phase II grant funding with design engineering planned throughout 2027.
See sourceHide source
Ogden's all about. It's a it's a planning study uh through a competitive process. The village board approved a contract with CivilTech to be our engineer to to help us with that process. this project, the goal of this project is to improve the Ogden Avenue corridor and that's certainly the right ofway improvements as well as certain uh it does touch on then…
CivilTech Engineering has completed crash, safety, geometric, traffic circulation, parking, environmental, and IDOT coordination studies. Phase I recommendations include side street improvements, signalized intersection enhancements, sidewalk improvements, and parking modifications to improve safety and accessibility. Ultimately, the Energize Ogden plan…