Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Seeking proposals from qualified contractors to provide Ferric sludge removal services. The initial service will involve the removal of approx. 700,000 to 1,000,000 gallons of ferric sludge, or up to a budget of $150,000, for hauling and liquid land application. The primary goal of this project is to create additional disposal capacity for waste generated by our water treatment plant processes. Sludge removal: remove between 700,000 to 1,000,000 gallons of Ferric sludge from our lagoon system; the sludge must be dewatered prior to hauling, ensuring that a higher proportion of sludge is removed compared to water, optimizing efficiency. Dewatering process: propose and implement a dewatering solution that will maximize sludge removal while minimizing the transportation of excess water. Disposal: haul and apply the dewatered sludge to appropriate land application sites in compliance with local, state, and federal regulations.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
This RFP is for professional services to design HVAC improvements, including renovation and potential electrification design, for the Filter, Flocculation, and Sedimentation Building and the Source Water Pump Station at a Recycling Treatment Plant.
Posted Date
-
Due Date
Jan 22, 2026
Close: Jan 22, 2026
This RFP is for professional services to design HVAC improvements, including renovation and potential electrification design, for the Filter, Flocculation, and Sedimentation Building and the Source Water Pump Station at a Recycling Treatment Plant.
AvailableThe Project generally includes: the excavation of approximately 225 tons of solid domestic sludge residual from the treatment plant's Reed Bed #1. The Contractor shall be responsible for the removal, transportation, and disposal of the waste at an approved location.
Posted Date
-
Due Date
Jan 28, 2026
Close: Jan 28, 2026
The Project generally includes: the excavation of approximately 225 tons of solid domestic sludge residual from the treatment plant's Reed Bed #1. The Contractor shall be responsible for the removal, transportation, and disposal of the waste at an approved location.
AvailableSludge removal contractors for the removal, dewatering, and disposal of accumulated sludge from three wastewater lagoons.
Posted Date
Dec 10, 2025
Due Date
Jan 27, 2026
Release: Dec 10, 2025
Close: Jan 27, 2026
Sludge removal contractors for the removal, dewatering, and disposal of accumulated sludge from three wastewater lagoons.
AvailableRemove and dispose of approx. 410 dry tons of biosolids from the sludge pond.
Posted Date
Jan 14, 2026
Due Date
Feb 3, 2026
Release: Jan 14, 2026
Close: Feb 3, 2026
Remove and dispose of approx. 410 dry tons of biosolids from the sludge pond.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis